Hearth and Home Technologies RCOR-HVB-CE, PIER-HVB-CE manual 3 4, Only for Model LCOR-HVB-CE

Page 38

Only for Model: LCOR-HVB-CE

1 2 3 4 6

5

TABS

CAUTION: Logs are fragile. Carefully remove the logs from the packaging. Logs #4 and #5 are the same log. See Service Parts pages for individual assembly photos.

1

LOG #1 (SRV2068-700):Place log #1 in front of grate tabs on the third and fourth grate bars on the right front corner. Position so that the bottom grooves fit over bars and the log is snug against the grate tabs.

2

LOG #2 (SRV2068-701):Locate log #2 in right rear corner of the log grate using bottom grooves for placement. Place log against grate tabs on fourth and fifth bars.

38

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

Image 38
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE NG, LP Exploded Parts Diagram PIER-HVB-CEST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Valve Assembly RCOR-HVB-CE ÍAppliance Certification Installation RegulationsPre-install Preparation CertificationDiagram of the PIER-HVB-CE Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07Diagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Framing the Fireplace Fireplace Dimensions and LocationsLocating the Fireplace Clearance RequirementsModel AT Each Joint Identifying Flue Components Installing the Flue SystemFlue System Approvals Terminations KitsStraight OUT Horizontalflueing Max. RunFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Installing Flue Components Attach the First Flue Component to the Starting CollarsCombustibles inside the framed firestop opening Install Support BracketsContinue Adding Flue Components Ceiling Firestop Ceiling Side Trapezoid Termination CapMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Securing of a Fireplace Positioning, Leveling, and Securing the FireplaceGas Control System Natural Gas Gas Supply LineGas Pressure Requirements Wall Switch Wiring the FireplaceOptional Accessories FinishingInstalling the Trim Installing Trim, Logs & Ember MaterialLog placement Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 3 4 Only for Model LCOR-HVB-CEHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Before Lighting the Fireplace After the InstallationDouble-check for faulty components Lighting the FireplaceReplacing old ember material Fireplace MaintenanceCleaning Glass Door Checking Flame Patterns, Flame Height5Troubleshooting Troubleshooting Be Placed in this Opening