Shows center of 254mm x 305mm (10”x12”) flue framing holes for top and rear flueing. The center of the hole is 25.4mm (one inch) above the center of the horizontal flue pipe.

D

Framing should be constructed of 51mm x 102mm (2” x 4”) lumber or heavier.

ST-HVB-CE

PIER-HVB-CE

B

C

A

A

C

E

L & R-COR-HVB-CE

B

B

A

C

NOTE: DIMENSIONS SHOWN IN CENTIMETERS AND (INCHES).

Model

A

B

C

D

E

PIER-HVB-CE

107 (42-1/8)

108 (42-1/2)

58 (23)

91 (35-3/4)

122 (48)

ST-HVB-CE

121 (47-5/8)

108 (42-1/2)

58 (23)

91 (35-3/4)

122 (48)

L&RCOR-HVB-CE

107 (42-1/8)

108 (42-1/2)

73 (28-3/4)

91 (35-3/4)

122 (48)

Figure 5. Framing Dimensions

18

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

Image 18
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE NG, LP Exploded Parts Diagram PIER-HVB-CEST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Valve Assembly RCOR-HVB-CE ÍAppliance Certification Installation RegulationsPre-install Preparation CertificationDiagram of the PIER-HVB-CE Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07Diagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Framing the Fireplace Fireplace Dimensions and LocationsLocating the Fireplace Clearance RequirementsModel AT Each Joint Identifying Flue Components Installing the Flue SystemFlue System Approvals Terminations KitsStraight OUT Horizontalflueing Max. RunFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Installing Flue Components Attach the First Flue Component to the Starting CollarsInstall Support Brackets Continue Adding Flue ComponentsCombustibles inside the framed firestop opening Ceiling Firestop Ceiling Side Trapezoid Termination CapMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Positioning, Leveling, and Securing the Fireplace Gas Control SystemSecuring of a Fireplace Gas Supply Line Gas Pressure RequirementsNatural Gas Wall Switch Wiring the FireplaceOptional Accessories FinishingInstalling the Trim Installing Trim, Logs & Ember MaterialLog placement Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 3 4 Only for Model LCOR-HVB-CEHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Before Lighting the Fireplace After the InstallationDouble-check for faulty components Lighting the FireplaceReplacing old ember material Fireplace MaintenanceCleaning Glass Door Checking Flame Patterns, Flame Height5Troubleshooting Troubleshooting Be Placed in this Opening