Hearth and Home Technologies RCOR-HVB-CE, PIER-HVB-CE Propane / Butane Flueing with TWO 90 Elbows

Page 24

NATURAL GAS

 

PROPANE / BUTANE

 

FLUEING WITH TWO 90° ELBOWS

FLUEING WITH TWO 90° ELBOWS

V (FT.)

H + H1 (FT.)

V (FT.)

H + H1 (FT.)

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

2' MAX. (610mm)

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

4' MAX.

(1.22m)

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

6’ MAX. (1.83m)

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

8' MAX.

(2.4m)

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

5’ MIN. (1.5m)

10' MAX.

(3.0m)

V + H + H1 = 40’ MAX. (12.2m)

V + H + H1 = 40’ MAX. (12.2m)

H + H1 = 15’ MAX. (4.5m)

 

H + H1 = 10’ MAX. (3.0m)

H1

 

 

 

 

 

 

 

 

V

 

 

 

 

 

H

 

 

Figure 13.

 

 

 

 

 

Flueing with Two 90° Elbows

 

 

 

 

 

 

NATURAL GAS

 

PROPANE / BUTANE

 

 

FLUEING WITH TWO 90° ELBOWS

FLUEING WITH TWO 90° ELBOWS

 

V (FT.)

H + H1 (FT.)

V (FT.)

H + H1 (FT.)

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

2' MAX. (610mm)

 

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

4' MAX.

(1.22m)

 

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

6’ MAX. (1.83m)

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

V + H + H1 = 40’ MAX. (12.2m)

V + H + H1 = 40’ MAX. (12.2m)

V

 

1

 

H + H1 = 10’ MAX. (3.0m)

H + H = 15’ MAX. (4.5m)

 

 

 

 

H1

 

 

 

 

 

 

 

H

 

 

 

 

Figure 14. Flueing with Two 90° Elbows

 

 

 

 

 

24

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

 

 

Image 24
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE NG, LP Exploded Parts Diagram PIER-HVB-CEST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Valve Assembly RCOR-HVB-CE ÍInstallation Regulations Pre-install PreparationAppliance Certification CertificationDiagram of the PIER-HVB-CE Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07Diagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Fireplace Dimensions and Locations Locating the FireplaceFraming the Fireplace Clearance RequirementsModel AT Each Joint Installing the Flue System Flue System ApprovalsIdentifying Flue Components Terminations KitsStraight OUT Horizontalflueing Max. RunFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Installing Flue Components Attach the First Flue Component to the Starting CollarsInstall Support Brackets Continue Adding Flue ComponentsCombustibles inside the framed firestop opening Ceiling Firestop Ceiling Side Trapezoid Termination CapMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Positioning, Leveling, and Securing the Fireplace Gas Control SystemSecuring of a Fireplace Gas Supply Line Gas Pressure RequirementsNatural Gas Wiring the Fireplace Optional AccessoriesWall Switch FinishingInstalling Trim, Logs & Ember Material Log placementInstalling the Trim Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 3 4 Only for Model LCOR-HVB-CEHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 After the Installation Double-check for faulty componentsBefore Lighting the Fireplace Lighting the FireplaceFireplace Maintenance Cleaning Glass DoorReplacing old ember material Checking Flame Patterns, Flame Height5Troubleshooting Troubleshooting Be Placed in this Opening