Hearth and Home Technologies RCOR-HVB-CE, PIER-HVB-CE, LCOR-HVB-CE Diagram of the ST-HVB-CE

Page 15

 

 

 

5-14

1/2

 

 

 

 

(133mm)

 

 

 

 

 

(13mm)

 

 

 

 

 

(4)

 

 

 

12

 

 

 

 

 

(306mm)

 

 

 

 

 

Ø8

 

 

 

 

 

(204mm)

 

 

 

 

12

Ø8

46-5/8

 

 

 

(204mm)

 

 

 

(305mm)

(1183mm)

 

 

 

 

 

 

 

 

42

 

 

 

 

 

(1067mm)

32-5/16

 

 

 

 

 

 

 

 

ELECTRICAL

 

(820mm)

 

4-1/2

34-3/4

ACCESS

 

21

 

(882mm)

 

 

 

(114mm)

 

 

(533mm)

 

 

 

GAS LINE

 

 

 

 

 

 

 

 

 

ACCESS

 

 

 

 

 

 

8-1/2

 

 

 

 

(216mm)

 

4-1/16

 

2-5/16

 

 

 

 

(58mm)

36-3/16

24

 

(102mm)

 

 

(919mm)

2-9/16

4-1/2

 

 

(610mm)

 

4-3/4

 

(64mm)

(114mm)

 

(121mm)

 

 

 

TOP FLUE

 

 

 

 

 

COLLARS

 

TOP STANDOFFS

 

 

 

 

 

 

 

 

 

 

 

 

REAR FLUE

 

 

 

 

 

COLLARS

 

 

GAS CONTROLS

 

 

 

 

 

& LABELS

 

 

 

 

 

 

 

 

GAS LINE

 

 

 

 

ACCESS

 

 

 

 

 

ELECTRICAL

 

 

 

 

 

ACCESS

 

Figure 2.

Diagram of the ST-HVB-CE

 

 

 

 

 

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

 

15

Image 15
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE PIER-HVB-CE NG, LP Exploded Parts DiagramST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Í Valve AssemblyCertification Installation RegulationsPre-install Preparation Appliance CertificationHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Diagram of the PIER-HVB-CEDiagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Clearance Requirements Fireplace Dimensions and LocationsLocating the Fireplace Framing the FireplaceModel AT Each Joint Terminations Kits Installing the Flue SystemFlue System Approvals Identifying Flue ComponentsMax. Run Straight OUT HorizontalflueingFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Attach the First Flue Component to the Starting Collars Installing Flue ComponentsInstall Support Brackets Continue Adding Flue ComponentsCombustibles inside the framed firestop opening Trapezoid Termination Cap Ceiling Firestop Ceiling SideMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Positioning, Leveling, and Securing the Fireplace Gas Control SystemSecuring of a Fireplace Gas Supply Line Gas Pressure RequirementsNatural Gas Finishing Wiring the FireplaceOptional Accessories Wall SwitchAttachment of Lower Door Assembly Installing Trim, Logs & Ember MaterialLog placement Installing the TrimHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Only for Model LCOR-HVB-CE 3 4Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Lighting the Fireplace After the InstallationDouble-check for faulty components Before Lighting the FireplaceChecking Flame Patterns, Flame Height Fireplace MaintenanceCleaning Glass Door Replacing old ember material5Troubleshooting Be Placed in this Opening Troubleshooting