Hearth and Home Technologies ST-HVB-CE, RCOR-HVB-CE, PIER-HVB-CE manual Flueing with Two 90 Elbows

Page 23

NATURAL GAS

 

 

H1

V

 

 

 

 

FLUEING WITH TWO 90° ELBOWS

 

H

V (FT.)

H + H1 (FT.)

 

 

 

1' MIN. (305mm)

3' MAX. (914mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

 

V + H + H1 = 40’ MAX. (12.2m)

 

 

 

H + H1 = 15’ MAX. (4.5m)

 

 

 

PROPANE / BUTANE

 

 

 

 

FLUEING WITH TWO 90° ELBOWS

 

 

V (FT.)

H + H1 (FT.)

 

 

 

1' MIN. (305mm)

2' MAX. (610mm)

 

 

2' MIN. (610mm)

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

 

V + H + H1 = 40’ MAX. (12.2m)

 

 

 

H + H1 = 10’ MAX. (3.0m)

 

 

 

NATURAL GAS

 

V1

 

 

 

 

FLUEING WITH TWO 90° ELBOWS

 

 

V + V1 (FT.)

 

H (FT.)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

 

V

2' MIN. (610mm)

6' MAX.

(1.83m)

 

H

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

 

V + V1 + H = 40’ MAX. (12.2m)

 

 

PROPANE / BUTANE

 

 

 

FLUEING WITH TWO 90° ELBOWS

 

 

V + V1 (FT.)

 

H (FT.)

 

 

1' MIN. (305mm)

2' MAX. (610mm)

 

 

2' MIN. (610mm)

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

 

V + V1 + H = 40’ MAX. (12.2m)

 

 

Figure 12. Flueing with Two 90° Elbows

 

 

 

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

23

Image 23
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE PIER-HVB-CE NG, LP Exploded Parts DiagramST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Í Valve AssemblyCertification Installation RegulationsPre-install Preparation Appliance CertificationHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Diagram of the PIER-HVB-CEDiagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Clearance Requirements Fireplace Dimensions and LocationsLocating the Fireplace Framing the FireplaceModel AT Each Joint Terminations Kits Installing the Flue System Flue System Approvals Identifying Flue ComponentsMax. Run Straight OUT HorizontalflueingFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Attach the First Flue Component to the Starting Collars Installing Flue ComponentsCombustibles inside the framed firestop opening Install Support BracketsContinue Adding Flue Components Trapezoid Termination Cap Ceiling Firestop Ceiling SideMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Securing of a Fireplace Positioning, Leveling, and Securing the FireplaceGas Control System Natural Gas Gas Supply LineGas Pressure Requirements Finishing Wiring the FireplaceOptional Accessories Wall SwitchAttachment of Lower Door Assembly Installing Trim, Logs & Ember MaterialLog placement Installing the TrimHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Only for Model LCOR-HVB-CE 3 4Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Lighting the Fireplace After the InstallationDouble-check for faulty components Before Lighting the FireplaceChecking Flame Patterns, Flame Height Fireplace MaintenanceCleaning Glass Door Replacing old ember material5Troubleshooting Be Placed in this Opening Troubleshooting