Hearth and Home Technologies PIER-HVB-CE Before Lighting the Fireplace, After the Installation

Page 41

Placing the Ember Material

Ember material is shipped with this gas fireplace. To place the ember material:

LATCHES

(BOTH TOP

AND BOTTOM)

GLASS

ASSEMBLY

Figure 33.

Remove the tension springs around the glass door.

Remove the glass door from the unit.

Remove the log set.

Place dime size pieces of ember material about 1/2 inch apart near port holes in burner top. Do NOT place em- bers over burner ports. Cover the top of the burner with a single layer of ember material.

Save the remaining ember materials for use during fire- place servicing. The bag of embers provided is sufficient for 3 to 5 applications.

Install the Lava Rock (supplied) to the firebox base pan being careful not to cover the burner with the Lava Rock.

Replace the logs, glass door, and a front trim door on the unit.

Figure 34. Placement of Embers

Step 11. Before Lighting the Fireplace

Before lighting the fireplace, be sure to do the following:

Remove all paperwork from underneath the fireplace. Review safety warnings and cautions

Read the Safety and Warning Information section at the beginning of this Installers Guide.

Double-check for gas leaks

Before lighting the fireplace, double-check the unit for possible gas leaks.

Double-check flue terminations and front grilles for obstructions.

Before lighting the fireplace, double-check the unit for possible obstructions that could be blocking the flue ter- minations or the front grilles.

Double-check for faulty components

Any component that is found to be faulty MUST BE re- placed with an approved component. Tampering with the fireplace components is DANGEROUS and voids all war- ranties.

A small amount of air will be in the gas supply lines. When first lighting the fireplace, it will take a few minutes for the lines to purge themselves of this air. Once the purging is complete, the fireplace will light and will operate normally.

Subsequent lightings of the fireplace will not require this purging of air from the gas supply lines, unless the gas valve has been turned to the OFF position, in which case the air would have to be purged.

NOTE: The fireplace should be run 3 to 4 hours on the initial start-up. Turn it off and let it cool completely. Remove and clean the glass. Replace the glass and run the fireplace for an additional 8 hours. This will help to cure the products used in the paint and logs.

During this break-in period it is recommended that some windows in the house be opened for air circulation. This will help avoid setting off smoke detectors, and help eliminate any odors associated with the fireplace’s initial burning.

Step 12. Lighting the Fireplace

You’ve reviewed all safety warnings, you’ve checked the fireplace for gas leaks, you know the flue system is unobstructed, and you’ve checked for faulty components. Now you’re ready to light the fireplace.

After the Installation

LEAVE THIS INSTALLATION MANUAL WITH

!THE APPLIANCE FOR FUTURE REFERENCE.

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

41

Image 41
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE PIER-HVB-CE NG, LP Exploded Parts DiagramST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Í Valve AssemblyPre-install Preparation Installation RegulationsAppliance Certification CertificationHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Diagram of the PIER-HVB-CEDiagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Locating the Fireplace Fireplace Dimensions and LocationsFraming the Fireplace Clearance RequirementsModel AT Each Joint Flue System Approvals Installing the Flue SystemIdentifying Flue Components Terminations KitsMax. Run Straight OUT HorizontalflueingFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Attach the First Flue Component to the Starting Collars Installing Flue ComponentsCombustibles inside the framed firestop opening Install Support BracketsContinue Adding Flue Components Trapezoid Termination Cap Ceiling Firestop Ceiling SideMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Securing of a Fireplace Positioning, Leveling, and Securing the FireplaceGas Control System Natural Gas Gas Supply LineGas Pressure Requirements Optional Accessories Wiring the FireplaceWall Switch FinishingLog placement Installing Trim, Logs & Ember MaterialInstalling the Trim Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Only for Model LCOR-HVB-CE 3 4Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Double-check for faulty components After the InstallationBefore Lighting the Fireplace Lighting the FireplaceCleaning Glass Door Fireplace MaintenanceReplacing old ember material Checking Flame Patterns, Flame Height5Troubleshooting Be Placed in this Opening Troubleshooting