Hearth and Home Technologies ST-HVB-CE, RCOR-HVB-CE manual Vent Termination Minimum Clearances

Page 31

G

v

D A

E

v

R

H

M

N

P

Q

(See Note 2)

L

 

B

 

 

 

 

B

 

 

v

v

B

 

v

 

 

 

 

F v

 

v

 

 

 

 

A

V

= VENT TERMINAL

X = AIR SUPPLY INLET

91.4 cm

 

 

V

 

 

 

 

T

 

 

 

 

 

 

 

I M

V

S

Electrical

S

V

 

Service

 

 

 

 

 

 

 

 

 

 

v

X

 

D

 

 

J or K

V

= AREA WHERE TERMINAL IS NOT PERMITTED

A

=

30.5 cm

clearances above grade, veran-

L

=

2.1 M

clearance above paved side-

 

 

(See Note 1)

da, porch, deck or balcony

 

 

 

 

 

(See Note 1)

 

walk or a paved driveway lo-

B

=

30.5 cm

clearances to window or door

 

 

 

 

 

 

 

 

cated on public property

M*

=

50.8 cm

clearance under veranda, porch,

 

 

 

that may be opened, or to per-

 

 

 

 

 

 

 

 

 

 

 

deck, balcony or overhang

 

 

 

manently closed window.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

118.9 cm

vinyl

 

 

 

 

 

(Glass)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

=

50.8 cm

vertical clearance to unventilat-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Alcove Applications

 

 

 

 

 

ed soffit or to ventilated soffit lo-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

cated above the terminal

 

 

N

 

=

15.3 cm

non-vinyl sidewalls

 

=

84.8 cm

for vinyl clad soffits and below

 

 

 

 

 

 

 

 

 

30.5 cm

vinyl sidewalls

 

 

 

electrical service

 

 

P

 

=

2.4 M

 

 

 

 

F

=

..............22.9 cm

clearance to outside corner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QMIN

RMAX

 

G

=

15.3 cm

clearance to inside corner

 

 

 

 

 

 

 

 

 

 

 

1 cap

 

91.4 cm

2 x Q ACTUAL

 

H

=

91.4 cm

not to be installed above a gas

 

 

 

 

 

 

 

 

2 caps

 

1.8 M

1 x Q ACTUAL

 

 

 

 

meter/regulator assembly within

 

 

 

 

 

 

 

 

 

 

 

3 caps

 

2.7 M

2/3 x Q ACTUAL

 

 

 

 

91.4 cm horizontally from the cen-

 

 

 

 

 

 

 

 

 

 

______________________________________________________________________

 

 

 

 

ter-line of the regulator

 

 

 

4 caps

3.7 M

1/2 x Q ACTUAL

 

I

=

91.4 cm

clearance to gas service regu-

 

 

 

QMIN = # termination caps x 3

RMAX = (2 / # termination caps) x QACTUAL

 

 

 

 

lator vent outlet

 

 

 

 

 

 

 

 

 

 

 

J

=

22.9 cm

clearance to non-mechanical air

 

S

=

15.3 cm

clearance from sides of

 

 

 

supply inlet to building or the

 

 

 

 

 

 

 

 

 

(See Note 5)

electrical service

 

 

 

combustion air inlet to any other

 

 

 

 

 

 

 

 

 

T

=

30.5 cm

clearance above electrical

 

 

 

appliance

 

K

=

91.4 cm

clearance to a mechanical (pow-

 

 

 

 

 

(See Note 5)

service

 

 

ered) air supply inlet

*only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2.

NOTE 1: On private property where termination is less than 2.1 M above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap shield is suggested. (See vents components page)

NOTE 2: Termination in an alcove space (spaces open only on one side and with an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be 91.4 cm minimum between termination caps. 2. All mechanical air intakes within 3.0 M of a termination cap must be a minimum of 91.4 cm below the termination cap. 3. All gravity air intakes within 91.4 cm of a termination cap must be a minimum of 30.5 cm below the termination cap.

Figure 26 Vent Termination Minimum Clearances

NOTE 3: Local codes or regulations may require different clearances.

NOTE 4: Termination caps may be hot. Consider their proximity to doors or other traffic areas.

NOTE 5: Location of the vent termination must not interfere with access to the electrical service.

NOTE 6: Vent system termination is permitted in porch areas with two or more sides open. You must follow all side walls, overhang and ground clearances as stated in the instructions.

NOTE 7: For terminals adjacent to walkways, terminal guards in accordance with BS EN 483:2001 are strongly recommended.

Heat & Glo assumes no responsibility for the improper perfor- mance of the appliance when the venting system does not meet these requirements.

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED.

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

31

Image 31
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE PIER-HVB-CE NG, LP Exploded Parts DiagramST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Í Valve AssemblyCertification Installation RegulationsPre-install Preparation Appliance CertificationHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Diagram of the PIER-HVB-CEDiagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Clearance Requirements Fireplace Dimensions and LocationsLocating the Fireplace Framing the FireplaceModel AT Each Joint Terminations Kits Installing the Flue SystemFlue System Approvals Identifying Flue ComponentsMax. Run Straight OUT HorizontalflueingFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Attach the First Flue Component to the Starting Collars Installing Flue ComponentsContinue Adding Flue Components Install Support BracketsCombustibles inside the framed firestop opening Trapezoid Termination Cap Ceiling Firestop Ceiling SideMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Gas Control System Positioning, Leveling, and Securing the FireplaceSecuring of a Fireplace Gas Pressure Requirements Gas Supply LineNatural Gas Finishing Wiring the FireplaceOptional Accessories Wall SwitchAttachment of Lower Door Assembly Installing Trim, Logs & Ember MaterialLog placement Installing the TrimHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Only for Model LCOR-HVB-CE 3 4Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Lighting the Fireplace After the InstallationDouble-check for faulty components Before Lighting the FireplaceChecking Flame Patterns, Flame Height Fireplace MaintenanceCleaning Glass Door Replacing old ember material5Troubleshooting Be Placed in this Opening Troubleshooting