Hearth and Home Technologies PIER-HVB-CE, RCOR-HVB-CE Straight OUT Horizontalflueing, Max. Run

Page 21

STRAIGHT UP

 

VERTICAL FLUEING

 

V (FT.)

CAP

12.2M MAX. (40 FT.)

 

Figure 8

 

STRAIGHT OUT

 

HORIZONTALFLUEING

 

H

 

Max. Run

 

610 mm (24 in.)

 

H

 

Figure 9.

 

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

21

Image 21
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE PIER-HVB-CE NG, LP Exploded Parts DiagramST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Í Valve AssemblyPre-install Preparation Installation RegulationsAppliance Certification CertificationHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Diagram of the PIER-HVB-CEDiagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Locating the Fireplace Fireplace Dimensions and LocationsFraming the Fireplace Clearance RequirementsModel AT Each Joint Flue System Approvals Installing the Flue SystemIdentifying Flue Components Terminations KitsMax. Run Straight OUT HorizontalflueingFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Attach the First Flue Component to the Starting Collars Installing Flue ComponentsInstall Support Brackets Continue Adding Flue ComponentsCombustibles inside the framed firestop opening Trapezoid Termination Cap Ceiling Firestop Ceiling SideMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Positioning, Leveling, and Securing the Fireplace Gas Control SystemSecuring of a Fireplace Gas Supply Line Gas Pressure RequirementsNatural Gas Optional Accessories Wiring the FireplaceWall Switch FinishingLog placement Installing Trim, Logs & Ember MaterialInstalling the Trim Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Only for Model LCOR-HVB-CE 3 4Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Double-check for faulty components After the InstallationBefore Lighting the Fireplace Lighting the FireplaceCleaning Glass Door Fireplace MaintenanceReplacing old ember material Checking Flame Patterns, Flame Height5Troubleshooting Be Placed in this Opening Troubleshooting