Hearth and Home Technologies ST-HVB-CE, RCOR-HVB-CE, PIER-HVB-CE, LCOR-HVB-CE Table of Contents

Page 3

Table of Contents

 

Safety and Warning Information

2

Service Parts List

4

Section 1: Approvals and Regulations

13

Appliance Certification

13

Installation Regulations

13

Section 2: Getting Started

13

Introducing the Heat & Glo Gas Fireplaces

13

Pre-install Preparation

13

Section 3: Installing the Fireplace

17

Step 1. Locating the Fireplace

17

Step 2. Framing the Fireplace

17

Step 3. Installing the Flue System

20

A. Flue System Approvals

20

B. Installing Flue Components

27

C. Flue Termination

29

Step 4. Positioning, Leveling, and Securing the Fireplace

32

Step 5. The Gas Control System

32

Step 6. The Gas Supply Line

33

Step 7. Gas Pressure Requirements

33

Step 8. Wiring the Fireplace

34

Step 9. Finishing

34

Step 10. Installing Trim, Logs & Ember Material

35

Installing the Trim

35

Positioning the Logs

35

Attachment of Lower Door Assembly

35

Placing the Ember Material

38

Step 11. Before Lighting the Fireplace

41

Step 12. Lighting the Fireplace

41

After the Installation

41

Section 4: Maintaining and Servicing Your Fireplace

42

Section 5: Troubleshooting

43

Î = Contains updated information.

 

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

3

Image 3
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE PIER-HVB-CE NG, LP Exploded Parts DiagramST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Í Valve AssemblyCertification Installation RegulationsPre-install Preparation Appliance CertificationHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Diagram of the PIER-HVB-CEDiagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Clearance Requirements Fireplace Dimensions and LocationsLocating the Fireplace Framing the FireplaceModel AT Each Joint Terminations Kits Installing the Flue SystemFlue System Approvals Identifying Flue ComponentsMax. Run Straight OUT HorizontalflueingFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Attach the First Flue Component to the Starting Collars Installing Flue ComponentsInstall Support Brackets Continue Adding Flue ComponentsCombustibles inside the framed firestop opening Trapezoid Termination Cap Ceiling Firestop Ceiling SideMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Positioning, Leveling, and Securing the Fireplace Gas Control SystemSecuring of a Fireplace Gas Supply Line Gas Pressure RequirementsNatural Gas Finishing Wiring the FireplaceOptional Accessories Wall SwitchAttachment of Lower Door Assembly Installing Trim, Logs & Ember MaterialLog placement Installing the TrimHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Only for Model LCOR-HVB-CE 3 4Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Lighting the Fireplace After the InstallationDouble-check for faulty components Before Lighting the FireplaceChecking Flame Patterns, Flame Height Fireplace MaintenanceCleaning Glass Door Replacing old ember material5Troubleshooting Be Placed in this Opening Troubleshooting