Hearth and Home Technologies LCOR-HVB-CE, RCOR-HVB-CE, PIER-HVB-CE manual Flueing with One 90 Elbow

Page 22

NATURAL GAS - FLUEING WITH ONE 90° ELBOW

 

V (FT.)

H (FT.)

 

1' MIN. (305mm)

3' MAX. (914mm)

 

2' MIN. (610mm)

6' MAX.

(1.83m)

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

 

V + H = 40’ MAX. (12.2m)(11.3m)

 

PROPANE/BUTANE-FLUEINGWITHONE90°ELBOW

 

V (FT.)

H (FT.)

 

1' MIN. (305mm)

2' MAX. (610mm)

V

2' MIN. (610mm)

4' MAX.

(1.22m)

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

6’ MIN. (1.83m)

12’ MAX.

(3.6m)

H

V + H = 40’ MAX. (12.2m)

 

Figure 10. Flueing with One 90° Elbow

 

 

 

 

 

H

 

 

 

 

 

 

V

NATURAL GAS

 

PROPANE / BUTANE

 

FLUEING WITH ONE 90° ELBOW

FLUEING WITH ONE 90° ELBOW

V (FT.)

H (FT.)

V (FT.)

H (FT.)

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

2' MAX. (610mm)

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

4' MAX.

(1.22m)

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

6’ MAX. (1.83m)

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

8' MAX.

(2.4m)

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

5’ MIN. (1.5m)

10' MAX.

(3.0m)

V + H = 40’ MAX. (12.2m)

V + H = 40’ MAX. (12.2m)

Figure 11. Flueing with One 90° Elbow

 

 

 

22

 

Heat & Glo • PIER/ST/L&RCOR-HVB-CE2068-900 Rev. H • 6/07

Image 22
Contents 0087 Safety and Warning Information Table of Contents PIER-HVB-CE NG, LP Exploded Parts Diagram PIER-HVB-CEST-HVB-CE ST-HVB-CE LCOR-HVB-CE LCOR-HVB-CE RCOR-HVB-CE RCOR-HVB-CE Valve Assembly RCOR-HVB-CE ÍAppliance Certification Installation RegulationsPre-install Preparation CertificationDiagram of the PIER-HVB-CE Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07Diagram of the ST-HVB-CE Diagram of the LCOR-HVB-CE and RCOR-HVB-CE Framing the Fireplace Fireplace Dimensions and LocationsLocating the Fireplace Clearance RequirementsModel AT Each Joint Identifying Flue Components Installing the Flue SystemFlue System Approvals Terminations KitsStraight OUT Horizontalflueing Max. RunFlueing with One 90 Elbow Flueing with Two 90 Elbows Propane / Butane Flueing with TWO 90 Elbows Flueing with three 90 elbows + H1 FT + V1 FT Installing Flue Components Attach the First Flue Component to the Starting CollarsContinue Adding Flue Components Install Support BracketsCombustibles inside the framed firestop opening Ceiling Firestop Ceiling Side Trapezoid Termination CapMinimum Height from Roof to Lowest Discharge Opening Vent Termination Minimum Clearances Gas Control System Positioning, Leveling, and Securing the FireplaceSecuring of a Fireplace Gas Pressure Requirements Gas Supply LineNatural Gas Wall Switch Wiring the FireplaceOptional Accessories FinishingInstalling the Trim Installing Trim, Logs & Ember MaterialLog placement Attachment of Lower Door AssemblyHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 3 4 Only for Model LCOR-HVB-CEHeat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Heat & Glo PIER/ST/L&RCOR-HVB-CE 2068-900 Rev. H 6/07 Before Lighting the Fireplace After the InstallationDouble-check for faulty components Lighting the FireplaceReplacing old ember material Fireplace MaintenanceCleaning Glass Door Checking Flame Patterns, Flame Height5Troubleshooting Troubleshooting Be Placed in this Opening