Frymaster SM35 operation manual Air Supply and Ventilation

Page 15

DEAN MILLIVOLT GAS FRYERS (NON-CE)

CHAPTER 2: IMPORTANT INFORMATION

2.7 Air Supply and Ventilation

DANGER

This appliance must be installed with sufficient ventilation to prevent the occurrence of unacceptable concentrations of substances harmful to the health of personnel in the room in which it is installed.

2.7 Air Supply and Ventilation (cont.)

Keep the area around the fryer clear to prevent obstruction of combustion and ventilation airflow.

1.Do not connect this fryer to an exhaust duct.

2.Correct installation and adjustment will ensure adequate airflow to the fryer system.

3.A commercial, heavy-duty fryer must vent its combustion wastes to the outside of the building. A deep-fat fryer must be installed under a powered exhaust hood, or an exhaust fan must be provided in the wall above the unit, as exhaust gas temperatures are approximately 800-1000°F (427-538°C). Check air movement during installation. Strong exhaust fans in the exhaust hood or in the overall air conditioning system can produce slight air drafts in the room.

4.Do not place the fryer’s flue outlet directly into the plenum of the hood, as it will affect the gas combustion of the fryer.

5.Never use the interior of the fryer cabinet for storage or store items on shelving over or behind the fryer. Exhaust temperatures can exceed 800°F (427ºC) and may damage or melt items stored in or near the fryer.

6.Adequate distance must be maintained from the flue outlet of the fryer(s) to the lower edge of the filter bank. Per NFPA Standards No. 96, a minimum of 18-inches (45-cm) should be maintained between the flue(s) and the lower edge of the exhaust hood filter.

7.Filters and drip troughs should be part of any industrial hood, but consult local codes before constructing and installing any hood. The duct system, the exhaust hood and the filter bank must be cleaned on a regular basis and kept free of grease.

2-5

Image 15
Contents 8195895 Page Page Table of Contents Preventative Maintenance This page Intentionally Left Blank Service Information After PurchaseOrdering Parts Safety Information Service PersonnelQualified and/or Authorized Operating Personnel Qualified Service Personnel Qualified Installation PersonnelThis page Intentionally Left Blank Receiving and Unpacking Equipment GeneralIf your equipment arrives damaged Rating Plate Principles of OperationPre-Installation ANSI/NFPA #70 Equipment Installed at High AltitudesAir Supply and Ventilation This page Intentionally Left Blank Installing the Fryer Leg and Caster InstallationGeneral Rigid Casters Only Leg and Rigid Caster InstallationLeveling the Fryer Legs OnlyFront ViewRear Side View Installing Optional Swivel CastersNational Code Requirements Gas ConnectionsRecommended Gas Supply Line Sizes Gas Types Number of Fryers Supply Line SpecificationsRigid Connections Manual shut-off valveRegulating Gas Pressure Gas Connections GAS Supply for Which IT is not Configured Adjustments/Adaptation To Different GasesBTU Gas InputsON/PILOT/OFF Gas Conversion ProceduresNatural Gas to Propane Kit Propane To Natural Gas Kit Gas Conversion ComponentsElectrical Connections Initial Start-up Dean Millivolt Series GAS Fryers NON-CE Fryer OperationsDean Millivolt Series GAS Fryers NON-CE Fryer Operations Boil-Out Procedure Final Preparation Dean Millivolt Series GAS Fryers NON-CE Fryer Operations This page Intentionally Left Blank Weekly Periodic/ Annual Pilot Burner Malfunction Dean Millivolt Series GAS Fryers NON-CE TroubleshootingMain Burner Malfunctions Recommended Spare Parts Wiring DiagramsService Hotline