Frymaster SM35 Gas Conversion Components, Natural Gas to Propane Kit Propane To Natural Gas Kit

Page 27

DEAN MILLIVOLT GAS FRYERS (NON-CE)

CHAPTER 3: INSTALLATION INSTRUCTIONS

3.7 Gas Conversion: Procedures (cont.)

Vessel Assembly

Manifold Support Bracket

Gas Burner

See Detail A

Orifice

Pressure

1/2—3/4 Reducer

Bushing

Gas Valve

Burner

1.63-inch [41-mm]

1.30-inch [33-mm]

Test

Spigot

Gas

Gas Manifold

Orifice

Manifold

Assembly

Temperature

Control

Detail A

Burner/Orifice Location

Typical gas valve, burner and orifice locations (SM50 shown above).

3.8 Gas Conversion Components

Use the following components to convert from natural gas to propane and vice-versa. See Section 3.6 for orifice quantities required for conversion.

Natural Gas to Propane Kit, 826-1817

Propane To Natural Gas Kit, 826-2017

 

 

Bushing, NPT Flush, SR 42 Series only

Bushing, NPT Flush, SR 42 Series only

 

 

Pilot orifice (16LP)

Pilot orifice (26N)

 

 

Burner orifice*

Burner orifice*

(See Table on Page 3-9)

(See Table on Page 3-9)

 

 

Rating label, contact factory at time of

Rating label, contact factory at time of

conversion.

conversion.

 

 

*Burner orifices listed on page 3-9 are for fryers operating at altitudes of 2000 feet or less. For altitudes greater than 2000 feet, contact the factory for the correct orifice size.

3-11

Image 27
Contents 8195895 Page Page Table of Contents Preventative Maintenance This page Intentionally Left Blank Service Information After PurchaseOrdering Parts Safety Information Service PersonnelQualified and/or Authorized Operating Personnel Qualified Service Personnel Qualified Installation PersonnelThis page Intentionally Left Blank Receiving and Unpacking Equipment GeneralIf your equipment arrives damaged Rating Plate Principles of OperationPre-Installation ANSI/NFPA #70 Equipment Installed at High AltitudesAir Supply and Ventilation This page Intentionally Left Blank Installing the Fryer Leg and Caster InstallationGeneral Rigid Casters Only Leg and Rigid Caster InstallationLeveling the Fryer Legs OnlyFront ViewRear Side View Installing Optional Swivel CastersNational Code Requirements Gas ConnectionsRecommended Gas Supply Line Sizes Gas Types Number of Fryers Supply Line SpecificationsRigid Connections Manual shut-off valveRegulating Gas Pressure Gas Connections GAS Supply for Which IT is not Configured Adjustments/Adaptation To Different GasesBTU Gas InputsON/PILOT/OFF Gas Conversion ProceduresNatural Gas to Propane Kit Propane To Natural Gas Kit Gas Conversion ComponentsElectrical Connections Initial Start-up Dean Millivolt Series GAS Fryers NON-CE Fryer OperationsDean Millivolt Series GAS Fryers NON-CE Fryer Operations Boil-Out Procedure Final Preparation Dean Millivolt Series GAS Fryers NON-CE Fryer Operations This page Intentionally Left Blank Weekly Periodic/ Annual Pilot Burner Malfunction Dean Millivolt Series GAS Fryers NON-CE TroubleshootingMain Burner Malfunctions Recommended Spare Parts Wiring DiagramsService Hotline