Frymaster SM35 operation manual Qualified Installation Personnel, Qualified Service Personnel

Page 9

DEAN MILLIVOLT GAS FRYERS (NON-CE)

CHAPTER 1: INTRODUCTION

1.5.1 Definitions (cont.)

B.Qualified Installation Personnel

1.Qualified installation personnel are individuals, or firms, corporations, or companies, which, either in person or through a representative are engaged in and are responsible for the installation of gas-fired appliances. Qualified personnel must be experienced in such work, be familiar with all gas precautions involved, and have complied with all requirements of applicable national and local codes.

C.Qualified Service Personnel

1.Qualified service personnel are those who are familiar with Dean equipment and have been authorized by Dean to perform service on Dean equipment. All authorized service personnel are required to be equipped with a complete set of service parts manuals and stock a minimum amount of parts for Dean equipment. A list of Dean Factory Authorized Service Centers (FASCs) was included with the fryer when shipped from the factory. Failure to use qualified service personnel will void the Dean warranty on your equipment.

1-3

Image 9
Contents 8195895 Page Page Table of Contents Preventative Maintenance This page Intentionally Left Blank Service Information After PurchaseOrdering Parts Safety Information Service PersonnelQualified and/or Authorized Operating Personnel Qualified Service Personnel Qualified Installation PersonnelThis page Intentionally Left Blank Receiving and Unpacking Equipment GeneralIf your equipment arrives damaged Rating Plate Principles of OperationPre-Installation ANSI/NFPA #70 Equipment Installed at High AltitudesAir Supply and Ventilation This page Intentionally Left Blank Installing the Fryer Leg and Caster InstallationGeneral Leveling the Fryer Leg and Rigid Caster InstallationLegs Only Rigid Casters OnlyFront ViewRear Side View Installing Optional Swivel CastersNational Code Requirements Gas ConnectionsRecommended Gas Supply Line Sizes Gas Types Number of Fryers Supply Line SpecificationsRigid Connections Manual shut-off valveRegulating Gas Pressure Gas Connections GAS Supply for Which IT is not Configured Adjustments/Adaptation To Different GasesBTU Gas InputsON/PILOT/OFF Gas Conversion ProceduresNatural Gas to Propane Kit Propane To Natural Gas Kit Gas Conversion ComponentsElectrical Connections Initial Start-up Dean Millivolt Series GAS Fryers NON-CE Fryer OperationsDean Millivolt Series GAS Fryers NON-CE Fryer Operations Boil-Out Procedure Final Preparation Dean Millivolt Series GAS Fryers NON-CE Fryer Operations This page Intentionally Left Blank Weekly Periodic/ Annual Pilot Burner Malfunction Dean Millivolt Series GAS Fryers NON-CE TroubleshootingMain Burner Malfunctions Recommended Spare Parts Wiring DiagramsService Hotline