Dean Millivolt Gas Fryers
Installation & Operation Manual
TABLE OF CONTENTS
|
| Page # |
1. | INTRODUCTION | |
1.1 | After Purchase | |
1.2 | Ordering Parts | |
1.3 | Service Information | |
1.4 | Safety Information | |
1.5 | Service Personnel | |
2. | IMPORTANT INFORMATION | |
2.1 | Receiving and Unpacking Equipment | |
2.2 | General | |
2.3 | Principles of Operation | |
2.4 | Rating Plate | |
2.5 | ||
2.6 | Equipment Installed at High Altitudes | |
2.7 | Air Supply and Ventilation | |
3. | INSTALLATION | |
3.1 | Installing the Fryer | |
3.2 | Leg and Caster Installation | |
3.3 | Leveling the Fryer | |
3.4 | Gas Connections | |
3.5 | Adjustments/Adaptation to Different Gases | |
3.6 | Gas Inputs | |
3.7 | Gas Conversion Procedures | |
3.8 | Gas Conversion Components | |
3.9 | Electrical Components | |
4. | FRYER OPERATIONS | |
4.1 | Initial | |
4.2 | ||
4.3 | Final Preparation |