Frymaster SM35 operation manual Adjustments/Adaptation To Different Gases

Page 24

DEAN MILLIVOLT GAS FRYERS (NON-CE)

CHAPTER 3: INSTALLATION INSTRUCTIONS

3.4Gas Connections (cont.)

F.After hook up, bleed the gas line of air to ensure that the pilot light will ignite quickly and evenly.

WARNING

Qualified personnel MUST perform any adaptation, modification, or gas conversion,

if required. Failure to use qualified personnel will void the Dean warranty.

3.5Adjustments/Adaptation To Different Gases

A.Proper operation of appliances requires operator to scrupulously inspect the following adjustments in terms of gas inputs and pressures.

B.Dean Super Marathon and Super Runner Series gas fryers are manufactured to use the type of gas and pressure specified on the rating plate. When changing gas, adaptation must be performed by qualified personnel. Failure to use qualified personnel will void the Dean warranty.

DANGER

This appliance was configured at the factory for a specific type of gas. Converting from one gas type to another requires the installation of specific gas-conversion components.

Switching to a different type of gas without installing the proper conversion

components may result in fire or explosion. NEVER ATTACH THIS APPLIANCE TO A

GAS SUPPLY FOR WHICH IT IS NOT CONFIGURED!

Conversion of this appliance from one type of gas to another should only be

performed by qualified, licensed, and authorized installation or service personnel, as

defined in Section 1.5 of this manual.

3-8

Image 24
Contents 8195895 Page Page Table of Contents Preventative Maintenance This page Intentionally Left Blank Service Information After PurchaseOrdering Parts Safety Information Service PersonnelQualified and/or Authorized Operating Personnel Qualified Installation Personnel Qualified Service PersonnelThis page Intentionally Left Blank Receiving and Unpacking Equipment GeneralIf your equipment arrives damaged Principles of Operation Rating PlatePre-Installation Equipment Installed at High Altitudes ANSI/NFPA #70Air Supply and Ventilation This page Intentionally Left Blank Installing the Fryer Leg and Caster InstallationGeneral Leg and Rigid Caster Installation Leveling the FryerLegs Only Rigid Casters OnlyInstalling Optional Swivel Casters Front ViewRear Side ViewGas Connections National Code RequirementsSupply Line Specifications Recommended Gas Supply Line Sizes Gas Types Number of FryersRigid Connections Manual shut-off valveRegulating Gas Pressure Gas Connections Adjustments/Adaptation To Different Gases GAS Supply for Which IT is not ConfiguredGas Inputs BTUGas Conversion Procedures ON/PILOT/OFFGas Conversion Components Natural Gas to Propane Kit Propane To Natural Gas KitElectrical Connections Dean Millivolt Series GAS Fryers NON-CE Fryer Operations Initial Start-upDean Millivolt Series GAS Fryers NON-CE Fryer Operations Boil-Out Procedure Final Preparation Dean Millivolt Series GAS Fryers NON-CE Fryer Operations This page Intentionally Left Blank Weekly Periodic/ Annual Dean Millivolt Series GAS Fryers NON-CE Troubleshooting Pilot Burner MalfunctionMain Burner Malfunctions Wiring Diagrams Recommended Spare PartsService Hotline