Frymaster SM35 Dean Millivolt Series GAS Fryers NON-CE Fryer Operations, Initial Start-up

Page 29

DEAN MILLIVOLT SERIES GAS FRYERS (NON-CE)

CHAPTER 4: FRYER OPERATIONS

4.1 Initial Start-up

WARNING

The on-site supervisor is responsible for ensuring that operators are made aware of the inherent hazards of operating a hot oil frying system, particularly the aspects of system operation, oil filtration, draining and cleaning procedures.

Cleaning: New units are wiped clean with solvents at the factory to remove any visible signs of dirt, oil, grease, etc. remaining from the manufacturing process, then coated lightly with oil. Before any food preparation, wash thoroughly with hot, soapy water to remove any film residue and dust or debris then rinse out and wipe dry. Also wash any accessories shipped with the unit. Close the drain valve completely and remove the crumb screen covering the heating tubes. Ensure the screws holding the thermostat and high-limit control sensing bulbs into the frypot are tight.

Typical high-limit/sensor probe location and mounting hardware.

WARNING

Do not bang fry baskets or other utensils on the fryer’s joiner strip. The strip is present to seal the joint between the frypot. Banging fry baskets on the strip to dislodge shortening will distort the strip, adversely affecting its fit. It is designed for a tight fit and should only be removed for cleaning.

DANGER

Never operate this appliance with an empty frypot. The frypot must be filled with water or cooking oil/shortening before lighting the burners. Failure to do so will damage the frypot and may cause a fire.

WARNING

When checking for burner ignition or performance, do not get too close to the burners. Slow ignition can cause possible flashback, increasing the potential for facial and body burns.

4-1

Image 29
Contents 8195895 Page Page Table of Contents Preventative Maintenance This page Intentionally Left Blank Ordering Parts Service InformationAfter Purchase Qualified and/or Authorized Operating Personnel Safety InformationService Personnel Qualified Service Personnel Qualified Installation PersonnelThis page Intentionally Left Blank If your equipment arrives damaged Receiving and Unpacking EquipmentGeneral Rating Plate Principles of OperationPre-Installation ANSI/NFPA #70 Equipment Installed at High AltitudesAir Supply and Ventilation This page Intentionally Left Blank General Installing the FryerLeg and Caster Installation Leveling the Fryer Leg and Rigid Caster InstallationLegs Only Rigid Casters OnlyFront ViewRear Side View Installing Optional Swivel CastersNational Code Requirements Gas ConnectionsRecommended Gas Supply Line Sizes Gas Types Number of Fryers Supply Line SpecificationsRegulating Gas Pressure Rigid ConnectionsManual shut-off valve Gas Connections GAS Supply for Which IT is not Configured Adjustments/Adaptation To Different GasesBTU Gas InputsON/PILOT/OFF Gas Conversion ProceduresNatural Gas to Propane Kit Propane To Natural Gas Kit Gas Conversion ComponentsElectrical Connections Initial Start-up Dean Millivolt Series GAS Fryers NON-CE Fryer OperationsDean Millivolt Series GAS Fryers NON-CE Fryer Operations Boil-Out Procedure Final Preparation Dean Millivolt Series GAS Fryers NON-CE Fryer Operations This page Intentionally Left Blank Weekly Periodic/ Annual Pilot Burner Malfunction Dean Millivolt Series GAS Fryers NON-CE TroubleshootingMain Burner Malfunctions Recommended Spare Parts Wiring DiagramsService Hotline