DEAN MILLIVOLT GAS FRYERS (NON-CE)

CHAPTER 3: INSTALLATION INSTRUCTIONS

3.3 Leveling the Fryer (cont.)

NOTE: The installation must be inspected after it is complete to ensure it meets the intent of these instructions. The on-site supervisor and/or operator(s) should be informed that the appliance is installed with restraints. If restraints are removed to move fryer (cleaning beneath and behind, relocation, etc.), ensure that they are re-installed when fryer is returned to its permanently installed position.

DANGER

The fryer MUST be connected to the gas supply specified on the rating and serial number

plate located on the back of the fryer door.

WARNING

If gas odors are detected, the gas supply MUST be shut off at the main shut-off valve. The

local gas company or FASC should be contacted immediately to rectify the problem.

3.4 Gas Connections

DANGER

Before connecting new pipe to this appliance the pipe must be blown out thoroughly to remove all foreign material. Foreign material in the burner and gas controls will cause improper and dangerous operation.

NATIONAL CODE REQUIREMENTS

This equipment is to be installed in compliance with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the U.S. Food and Drug Administration.

This equipment is manufactured to use the type of gas specified on the rating plate attached to the door. Connect equipment stamped "NAT" only to natural gas and that stamped "PRO" only to LP (Propane) gas.

Installation shall be made with a gas connector that complies with national and local codes.

Quick disconnect devices, if used, shall likewise comply with national and local codes.

DANGER

The fryer MUST be connected to the gas supply specified on the rating and serial number

plate located on the back of the fryer door.

3-4

Image 20
Contents 8195895 Page Page Table of Contents Preventative Maintenance This page Intentionally Left Blank Ordering Parts Service InformationAfter Purchase Qualified and/or Authorized Operating Personnel Safety InformationService Personnel Qualified Installation Personnel Qualified Service PersonnelThis page Intentionally Left Blank If your equipment arrives damaged Receiving and Unpacking EquipmentGeneral Principles of Operation Rating PlatePre-Installation Equipment Installed at High Altitudes ANSI/NFPA #70Air Supply and Ventilation This page Intentionally Left Blank General Installing the FryerLeg and Caster Installation Leg and Rigid Caster Installation Leveling the FryerLegs Only Rigid Casters OnlyInstalling Optional Swivel Casters Front ViewRear Side ViewGas Connections National Code RequirementsSupply Line Specifications Recommended Gas Supply Line Sizes Gas Types Number of FryersRegulating Gas Pressure Rigid ConnectionsManual shut-off valve Gas Connections Adjustments/Adaptation To Different Gases GAS Supply for Which IT is not ConfiguredGas Inputs BTUGas Conversion Procedures ON/PILOT/OFFGas Conversion Components Natural Gas to Propane Kit Propane To Natural Gas KitElectrical Connections Dean Millivolt Series GAS Fryers NON-CE Fryer Operations Initial Start-upDean Millivolt Series GAS Fryers NON-CE Fryer Operations Boil-Out Procedure Final Preparation Dean Millivolt Series GAS Fryers NON-CE Fryer Operations This page Intentionally Left Blank Weekly Periodic/ Annual Dean Millivolt Series GAS Fryers NON-CE Troubleshooting Pilot Burner MalfunctionMain Burner Malfunctions Wiring Diagrams Recommended Spare PartsService Hotline