3USING THE PS HUB
This chapter contains the following topics:
■Description of the hub’s LEDs and ports
■Positioning the hub
■Rack and wall mounting the hub
■Connecting PS Hubs together
■Connecting workstations and other equipment to the hub
■Spot Checks
LEDs and Ports Figure 3-1 (over the page) shows the hub’s diagnostic LEDs and easy to
use ports. This diagram also appears on the Quick Reference Guide.
The LEDs:
■Show you how the hub and its ports are operating
■Show you how the hub’s segments are operating
■Alert you to a potential problem with your ne twork
The different types of ports are used for:
■Connecting workstations and other equipment to your hub
■Connecting your hub to other PS Hubs, to form a stack
■Connecting a management station to your hub for local
management
CAUTION: Only connect a Supe rStack® II Redundant Power System to
the Redundant Power System socket.
Do not remove the transceiver module blanking plate with the power
still connected.