20 | 2 System tour |
Setting up your system
Preinstallation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for the system for maximum efficiency. Consider the following factors when choosing a site for the system:
•Near a grounded power outlet
•Clean and
•Sturdy surface free from vibration
•
•Secluded from electromagnetic fields produced by electrical devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
•Acer Altos G610 ystem
•Acer Altos G610 User’s guide (with system binder)
•
•System keys (hung inside the front panel door)
If any of the above items are damaged or missing, contact your dealer immediately.
Save the boxes and packing materials for future use.