AEG Thyro-S H1 Prior to installation / commissioning, Maintenance, service, faults, Transport

Models: Thyro-S H1

1 48
Download 48 pages 48.05 Kb
Page 8
Image 8

2.6.2Prior to installation / commissioning

-If stored in a cold environment: ensure that the device is absolutely dry. (Allow the device a period of at least two hours to acclimatize before commissioning)

-Ensure sufficient ventilation of the cabinet if mounted in a cabinet.

-Observe minimum spacing.

-Ensure that the device cannot be heated up by heat sources below it. (see page 33, Technical data).

-Ground the device in accordance with local regulations.

-Connect the device in accordance with the connection diagrams.

2.6.3Maintenance, service, faults

In order to avoid personal and material damages, the user must observe the following:

-Before all work:

>Disconnect the device from all external voltage sources.

>Secure the device against accidentally being switched back on.

>Use suitable measuring instruments and check that there is no voltage present.

>Ground and short circuit the device.

>Provide protection by covers or barriers for any neighboring live parts.

-The device may only be serviced and repaired by trained electro-technical personnel.

2.6.4Transport

-Only transport the device in the original packaging.

-Protect the device against damage, caused by jolts, knocks and contamination, for instance.

8

Page 8
Image 8
AEG Thyro-S H1 manual Prior to installation / commissioning, Maintenance, service, faults, Transport