Alamo EAGLE 10/15 manual Maintenance

Models: EAGLE 10/15

1 180
Download 180 pages 1.05 Kb
Page 169
Image 169

MAINTENANCE

loosened. Repeat this process until the Shaft no longer becomes loose in the assembly. Unscrew the Nut a small amount and again tap each end of Shaft while holding the Hub. Repeat this process until a rolling torque of 10 to 12 inch pounds is reached on the Shaft.

STEP 4

Apply a small amount of Silicon sealer to the bore of the Hub Cap and to the outside diameter of the Seal. FIGURE Mnt-R-0063.Drive the Seal into the base of the Hub Cap. FIGURE Mnt-R-0063-Mnt-R-0067

EAGLE 15 03/09

Maintenance Section 5-25

©2009 Alamo Group Inc.

MAINTENANCE

Page 169
Image 169
Alamo EAGLE 10/15 manual Maintenance