
MAINTENANCE
Figure MntP-R-0014) Grease and install the sleeve baring in groove at the end of the sleeve (only on one half shaft).
Figure MntP-R-0015) Slide the shield tube assembly over the shaft, so that the bearing holes in the shield align with the shield bearing groove on the yoke.
Figure MntP-R-0016) Install two shield bearings per half shaft by pushing one bearing in each bearing hole. The shield bearings should be installed in the direction of the shaft rotation relative to the shields
Figure MntP-R-0017) Attach safety decal as needed.
Eagle 20 03/09 | Maintenance Section |
© 2009 Alamo Group Inc.