Mount Kit Component Identification
11.Install Operators Manual Cannister. The operator manual cannister bolts to the hydraulic tank on the side toward operator, this cannister should have the operators manual inside of it when shipped from the factory (See Figure 8). Note: The hydrau- lic tank has the return filter and directional control valve (Solenoid) already connected to it when shipped from the factory.
12.Install Valve Control Handle Mounting Brack- ets. The valve control stand weldment (P/N 107352) will bolt to the flat operators platform on the RH side. Install the mount stand where it will be convenient for the operator to use. The control stand weldment is adjustable for height, this is done by selecting the mounting hole you want to use. The stand can be cut for height adjustment if wanted. The valve control bracket (P/N 02977335) bolts the stand weldment using the holes that best fir the opera- tors needs (See Figure 9 & 10). Once the right dis- tance is decided to fit operator the valve control mount will bolt to the floor of the operators plat form with 4 bolts. The holes will need to drilled through the floor, check the under side of the floor before drilling any holes to make certain drill bit will not hit and damage anything (See Figure 11).
Motor Directional
Control Valve
Return Filter
Assembly
Operators Manual |
|
Cannister |
|
Figure 8 | Hydraulic Tank |
| |
P/N 107352 |
|
Control Stand |
|
Weldment |
|
P/N 02977335 | |
Valve Mount Brkt | |
Weldment |
|
Figure 9 |
|
Figure 10
Figure 11
Switch Blade
© 2005 Alamo Group Inc. | Section 4 - 5 |