Manuals
/
Alto-Shaam
/
Kitchen Appliance
/
Oven
Alto-Shaam
manual AR-6GRotisserie Operation & Care Manual •
Models:
AR-6G
1
32
34
34
Download
34 pages
12.17 Kb
27
28
29
30
31
32
33
34
<
>
Specifications
Install
Wire Diagrams
bulb replacement instructions
Warranty
Dimension
Maintenance
full assembly - Front view
safety proceDUres anD precaUtIons
Air Adjustments
Page 32
Image 32
AR-6G
Rotisserie Operation & Care Manual • 30
Page 31
Page 33
Page 32
Image 32
Page 31
Page 33
Contents
• Installation
• Maintenance
• Operation
R o t i s s e r i e
D a n G e r
DanGer
Care and Cleaning
Installation
U n p a c K I n G
c a U t I o n
D e l I V e r y
safety proceDUres anD precaUtIons
W a r n I n G
n o t e
D a n G e r
common specifications
accessories
I n s t a l l a tio n
AR-6G
I n s t a l l a tio n
t e c h nical specifications
dimensions h x w x d
Motor Switch
Power Cord Plug Type
Unit Power Rating
site INSTALLATION
INSTALLATION CODES & STANDARDS
standard for GAS FOOD SERVICE EQUIPMENT
VENTILATION REQUIREMENTS
POSITIONING ON SITE
POSITIONING REQUIREMENTS
site INSTALLATION
I n s t a l l a tio n
20 508mm 77-1/21969mm 18 457mm 79 1999mm
ve n til a tion instructions
D a n G e r
c a U t I o n
W a r n I n G
e l e c t ric a l
electrIcal GroUnDInG InstrUctIons
aVertIssement: Directives
ENSURE POWER SOURCE MATCHES VOLTAGE STAMPED
AIR ADJUSTMENTS
air supply
AIR SUPPLY
NATURAL
gas specifications
INSTALLATION REQUIREMENTS
GAS PRESSURE CHART
TECHNICAL SPECIFICATIONS
GAS INTAKE
D a n G e r
DanGer
DanGer
Securing Electrical Access Cover
W a r n I n G
I n s t a l l a tio n
gas connections
leak testing
gas exhaust
neVer Use an open flame to leaK test
ignition system
O P E R A TING INSTRUCTIONS
burner lighting instructions
W a r n I n G
c a U t I o n
c o n t r o l s
door catch
O P E R A TING INSTRUCTIONS
g a s
P L A C E M E N T & ADJUSTMENT OF SPITS
PRODUCT PREPARATION
neVer Use or place alUmInUm foIl In the applIance
USING A FROZEN PRODUCT IS NOT RECOMMENDED
SKEWE R PREPARATION & LOADING
cooking time
n o t e
c a U t I o n
care and cleaning
daily cleaning
eq u ipment care
seVere DamaGe or electrIcal haZarD coUlD resUlt
maintenance
Cleaning & reseasoning cast iron tiles
c h a ng ing of light bulbs
OPENING MACHINE COMPARTMENTS
s e rv ic e
t r oub l e s h o o ting guide
full assembly - Front view
s e rv ic e
AR-6GRotisserie Operation & Care Manual •
ITEM
final floor assembly - Front view
final floor assembly - Back view
s e rv ic e
AR-6GRotisserie Operation & Care Manual •
final floor assembly - Front & Back view
s e rv ic e
AR-6GRotisserie Operation & Care Manual •
ITEM
motor mount assembly
Assembly Instructions
s e rv ic e
5 1 4 7 8 10 63
top assembly
s e rv ic e
AR-6GRotisserie Operation & Care Manual •
ITEM
Bottom Assembly
gas plumbing assembly
s e rv ic e
AR-6GRotisserie Operation & Care Manual •
Bottom Assembly
gas plumbing assembly
s e rv ic e
AR-6GRotisserie Operation & Care Manual •
bulb replacement instructions
GlOvES ShOulD BE WORN WhEN REplACING BulBS
c a U t I o n
c a U t I o n
AR-6GRotisserie Operation & Care Manual •
CLEARANCES
GAS CONNECTIONS
PHYSICAL CONDITION
s e rv ic e
LIMITED WARRANTY
The parts warranty period is as follows
THIS WARRANTY DOES NOT APPLY TO
TRANSPORTATION DAMAGE and CLAIMS