American Power Conversion MX28B2400 manual Commissioning And Preventive Maintenance, Operation

Models: MX28B2400 MX28B4800

1 70
Download 70 pages 19.33 Kb
Page 3
Image 3

 

3.10.

EXTERNAL ALARM INPUT CONNECTIONS

25

 

3.11.

RECTIFIER MODULE INSTALLATION

26

4 COMMISSIONING AND PREVENTIVE MAINTENANCE

27

 

4.1.

PRE-COMMISSIONINGINSPECTION

27

 

Environment

27

 

Electrical Installation

27

 

Battery Visual and Safety Inspection

27

 

4.2.

COMMISSIONING

28

 

Initial Set-up

28

 

AC Power Up

28

 

DC Power Up:

29

 

Rectifier Test:

29

 

LVD Test

29

 

Battery Power Up

29

 

Circuit Breaker/ Fuse Test:

30

 

User Inputs

30

 

Output Relays:

30

 

Battery Temperature Compensation

30

 

4.3.

FINAL INSPECTION:

31

5

OPERATION

32

 

5.1.

TECHNICAL DESCRIPTION

32

 

5.2.

RECTIFIER MANAGEMENT

32

 

AC Input Power

32

 

DC Output Power

32

 

Rectifier alarms reporting

32

 

5.3.

SYSTEM MANAGEMENT

33

 

System Output Capacity

33

 

System Voltage Control

33

 

System Current

33

 

System Status and Alarm Reporting

34

 

5.4.

DC DISTRIBUTION

34

 

5.5.

BATTERY MANAGEMENT

34

 

Battery Charging and Protection

34

 

Battery/Load Low Voltage Disconnect

35

 

5.6.

CONTROLS AND INDICATORS

35

 

Front Panel User Interface

35

 

Parameter Locations, Descriptions, and Default Values

36

 

Control Unit Menu Structure

46

 

Front Panel LED Indicators

52

 

5.7.

ALARM OUTPUTS (OUTPUT RELAYS)

52

 

5.8.

EXTERNAL ALARM INPUTS (INPUT RELAYS)

53

6

REMOTE MONITORING

54

 

6.1.

DESCRIPTION

54

 

6.2.

PHYSICAL CONNECTIONS

54

MX28B1200/2400 MX28B1200/4800 –48 VDC User’s Manual

Page iii

Page 3
Image 3
American Power Conversion MX28B2400, MX28B4800 manual Commissioning And Preventive Maintenance, Operation, Remote Monitoring