Table of Contents

 

1

SAFETY FIRST!

1

 

1.1.

WARNING SYMBOLS

1

 

1.2.

GENERAL PRECAUTIONS:

1

2

INTRODUCTION

2

 

2.1.

GENERAL INFORMATION

2

 

2.2. HOW TO USE THIS MANUAL

2

3

INSTALLATION

5

 

3.1.

UNPACKING EQUIPMENT

5

 

3.2.

MECHANICAL INSTALLATION

5

 

Room / Location

5

 

Mounting

6

 

Power Bus Connections

6

 

Circuit Breaker/LVD Ribbon Cable Connections

8

 

Fuse Alarm Ribbon Cable Connections

9

 

Ventilation

9

 

3.3.

AC POWER CONNECTIONS

9

 

3.4.

BATTERY CONNECTIONS

11

 

Planning the Battery Installation

11

 

Connecting the Battery Cables

12

 

3.5.

DC SYSTEM GROUNDING

13

 

3.6.

DC POWER OUTPUT OVER-CURRENTPROTECTION

14

 

DC Plug-in Circuit Breakers

14

 

DC Bolt-in Circuit Breakers

17

 

Telecom Fuses

18

 

3.7. INSTALLATION OF CIRCUIT BREAKERS AND FUSES

19

 

Plug-in Circuit Breaker Installation

19

 

Bolt-in Circuit Breaker Installation

20

 

Telecom Fuse Installation

21

 

GMT Fuse Installation

21

 

3.8.

LOAD CONNECTIONS

22

 

Cable Size Considerations

22

 

Circuit Breaker Connections (1 to 50 Amps)

22

 

Circuit Breaker Connections (60-100 Amps)

22

 

Return Connections (1-100 Amps)

22

 

GMT Fuse Connections

23

 

3.9. MONITORING AND RELAY OUTPUT CONNECTIONS

23

 

Front Panel DB9 Connection

23

 

“Smart” Cable DB9 Connection

23

 

RJ45 Ethernet Connector

24

 

Relay Output Connections

24

MX28B1200/2400 MX28B1200/4800 –48 VDC User’s Manual

Page ii

Page 2
Image 2
American Power Conversion MX28B4800, MX28B2400 manual Table of Contents