Section |
|
10.2 Ordering Guide
As an example, assume a system is to be ordered for deployment in North America. The site is a three sector site employing three
Quantity | Part Number | Description |
|
|
|
1 | Local Controller | |
1 | ||
3 | Actuators | |
Optional | Lightning Protection Unit | |
1 | 80 Meter Cable | |
3 | 4 Meter Cables | |
1 or more | 602299 | Grounding Kit |
2 | 40417 | Tiewraps, Bag of 50 |
|
|
|
The 80 m length is selected since it is the smallest size greater than 77 m. Field fitting of connectors is not recommended in order that reliable, weatherproof connections can be maintained.
Although the distance between antennas is 2 m, you will generally require a cable longer than this ‘straight line’ distance.
The junction box requires grounding. If a lightning protection unit is used, it must also be grounded.
10- | May 2005 | Bulletin 639510 |