The items required for the optional configurations described in this chapter are not included in the standard barebone system package. These items are purchased separately.

Preparing the system for rack mounting

Removing the footpads or roller wheels

Refer to section “2.10.6 Chassis footpads and roller wheels” for instructions on removing the footpads or roller wheels.

Removing the top cover

To remove the top cover:

1.Remove the side cover. Refer to section “2.1.1 Removing the side cover” for instructions.

2.Remove the front panel assembly. Refer to section “2.5.1 Removing the front panel assembly” for instructions.

3.Locate the lock tab underneath the top cover and press it outward to release the cover.

4.Slide the top cover toward the front panel, then lift it up from the chassis.

Lock tab of top cover (botto m view)

Attaching the rack rails

Refer to the installation guide that came with the Rackmount Rail Kit for instructions on how to attach the rails and on the barebone server system and the corresponding rails on the industrial rack.

3 - 2

Chapter 3: Installation options