After installation
Step 2: Remove the installation equipment
LSP failover testing
If you have an S8300 media server module installed in the G350 and configured as an LSP, you need to perform a test to make sure that the LSP takes over control of the G350 if the G350 becomes disconnected from the remote media server. Work with the supporting technician to perform this test. The test involves disconnecting from the remote media server and testing the telephones connected to the G350.
Step 2: Remove the installation equipment
Remove all equipment that you used to assist you in the installation process. This may include:
•The
•The software upgrade CDs.
•The laptop computer.
•The modem (for installations without an S8300 module only).
NOTE:
If you have an S8300 media server module installed in the G350, leave the modem connected to enable reporting of alarms to remote locations.
The installation is now complete.
54 | Installation of the G350 Media Gateway |
| December 2003 |