IMPORTANT — READ BEFORE INSTALLING
1.Read and become familiar with these installation instructions before installing this unit (Fig. 1A and 1B).
2.Be sure the installation conforms to all applicable lo- cal and national codes.
3.These instructions contain important information for the proper maintenance and repair of this equipment. Retain these instructions for future use.
CONTENTS
Page
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . 1
I. Step 1 — Provide Unit Support. . . . . . . . . . . . . . . . . 1
II. Step 2 — Field Fabricate Ductwork . . . . . . . . . . . . . 4
III. Step 3 — Install External Trap for
Condensate Drain . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 IV. Step 4 — Rig and Place Unit. . . . . . . . . . . . . . . . . . . 4 V. Step 5 — Install Flue Hood . . . . . . . . . . . . . . . . . . . . 6 VI. Step 6 — Install Gas Piping . . . . . . . . . . . . . . . . . . . 6 VII. Step 7 — Make Electrical Connections . . . . . . . . . 10 VIII. Step 8 — Adjust
APPENDIX A — ECONOMI$ER+ LABEL . . . . . . . . . . . 58, 59
APPENDIX B — JOB SPECIFIC ECONOMI$ER+ CONFIGURATION SETTINGS . . . . . . . . . . . . . . . . . . . . . 60
INDEX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
SAFETY CONSIDERATIONS
Installation and servicing of
Untrained personnel can perform basic maintenance func- tions of cleaning coils and filters and replacing filters. All other operations should be performed by trained service per- sonnel. When working on
Follow all safety codes. Wear safety glasses and work gloves. Use quenching cloth for unbrazing operations. Have fire extinguishers available for all brazing operations.
WARNING: Disconnect gas piping from unit when leak testing at pressure greater than 1/2 psig. Pres- sures greater than 1/2 psig will cause gas valve damage resulting in hazardous condition. If gas valve is sub- jected to pressure greater than 1/2 psig, it must be replaced before use. When pressure testing field- supplied gas piping at pressures of 1/2 psig or less, a unit connected to such piping must be isolated by man- ually closing the gas valve.
WARNING: Before performing service or mainte- nance operations on unit, turn off main power switch to unit and install a lockout tag. Electrical shock could cause personal injury.
CAUTION: Ensure voltage listed on unit data plate agrees with electrical supply provided for the unit.
INSTALLATION
Unit is shipped in the vertical duct configuration. To convert to horizontal configuration, remove screws from side duct open- ing covers and remove covers. Using the same screws, install covers on vertical duct openings with the
Confirm before installation of unit that voltage, amperage and circuit protection requirements listed on unit data plate agree with power supply provided.
I. STEP 1 — PROVIDE UNIT SUPPORT
A. Roof Curb
Assemble and install accessory roof curb in accordance with instructions shipped with curb. See Fig. 3. Install insulation, cant strips, roofing felt, and counter flashing as shown. Duct- work must be attached to curb, not to the unit. The accessory
If electric and control wiring is to be routed through the basepan, attach the accessory
IMPORTANT: The gasketing of the unit to the roof curb is critical for a watertight seal. Install gasket supplied with the roof curb as shown in Fig. 3. Improperly applied gasket can result in air leaks and poor unit performance.
Curb should be level. Unit leveling tolerances are shown in Fig. 4. This is necessary for unit drain to function properly. Refer to Accessory Roof Curb Installation Instructions for additional information as required.