ELECTRICAL REQUIREMENTS
WARNING - If the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with a special cord available from the manufacturer or its service agent in order to avoid a hazard.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
WHI
N
BLU
L3
RED
L2
BLK
L1
GREENGREEN
120/208 and 120/240 volt ac three phase, 50/60 Hz models
BLK BLU | TO MACHINE | WHI | |
RED |
| ||
L1 | L2 | L3 | N |
FROM POWER SOURCE
FOR SINGLE PHASE OPERATION MOVE BLU WIRE INTO TERMINAL BLOCK WITH BLACK WIRE. CONNECT INPUT WIRING TO:
L1, L2 & N FOR 120/208V & 120/240V MODELS,
L1 & N for 230V MODELS.
WHI
N
BLU
L3
RED
L2
BLK
L1
GREENGREEN
400/230V volt ac three phase,
50/60 Hz models
Note: This electrical service consists of 4 cur- rent carrying conductors (Neutral, L1, L2 and L3) and a separate conductor for earth ground.
Note: This electrical service consists of 4 cur- rent carrying conductors (Neutral, L1, L2 and L3) and a separate conductor for earth ground.
SYSTEM |
|
|
VOLTAGE | V1 | V2 |
208 | 208 | 120 |
240 | 240 | 120 |
L1, L2, L3, are the 3 phases
V1 = Phase to phase voltage, between any 2 phases.
V2 = Phase to neutral voltage, L1 to neutral must be 120V.
SYSTEM |
|
|
VOLTAGE | V1 | V2 |
400 | 400 | 230 |
230 |
| 230 |
L1, L2, L3, are the 3 phases
V1 = Phase to phase voltage, between any 2 phases.
V2 = Phase to neutral voltage, L1 to neutral must be 230V.
ELECTRICAL HOOK-UP
1.An electrician must provide electrical service as specified in conformance with all local, state and federal electrical codes.
2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
NOTE - The brewer is shipped without a plug on the power cord. Qualified service personnel must select and install the proper UL listed grounding type attachment plug specified on the rear of the brewer.
3.Install the specified plug on the attached power cord.
4.Remove the front access panel to gain access to the terminal block.
5.Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
6.If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial
Page 5 | 40119 030608 |
|