INITIAL SET-UP
1.Insert an empty funnel into the funnel rails of one of the brew stations.
2.Place an empty server under the funnel.
3.Connect the brewer to the power source. Make sure the corresponding ON/OFF switch is ON (LED will be lit).
4.Water will flow into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT...
TANK FILLING until tank is filled with water.
5.Wait approximately
6.Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refill- ing.
7.Water volumes and flow settings have been preset at the factory. Refer to adjustments for the Set Brew Vol- umes or Calibrate Flow section of this manual should the volume need to be increased or decreased.
8.The brewer is now ready for use in accordance with the instructions for Coffee Brewing.
205° F (96.1° C)
VIEWING ASSET & SERIAL NUMBER
1.To view the asset number of the machine, press and hold the left hidden button until the display reads: ANXXXXXX...ASSET NUMBER. Release the left hidden button.
2.After a 5 second delay, the display will read: DTTNXXXXXX. This is the serial number of the machine.
Page 8 | 40119 071107 |
|