Table 3-7 Controller Pre-Trip Test Codes (Sheet 2 of 4)

 

 

Requirements: For units equipped with secondary supply probe only.

 

 

Pass/Fail Criteria: The temperature difference between primary and secondary probe

 

 

(supply) is compared.

P5-1

Supply Probe Test

NOTE

 

 

If this test fails, “P5-1” and FAIL will be displayed. If both Probe tests (this

 

 

and the SUPPLY/ RETURN TEST) pass, because of the multiple tests, the

 

 

display will read ’P 5’ ’PASS’.

 

 

 

 

 

Requirements: For units equipped with secondary return probe only.

 

 

Pass/Fail Criteria: The temperature difference between primary and secondary

 

 

probe (return) is compared.

 

 

NOTES

P5-2

Return Probe Test

1. If this test fails, “P5-2” and “FAIL” will be displayed. If both Probe tests

 

 

(this test and the SUPPLY/ RETURN) pass, because of the multiple

 

 

tests, the display will read “P 5,” “PASS.”

 

 

2. The results of Pre-Trip tests 5-0, 5-1 and 5-2 will be used to activate or

 

 

clear control probe alarms.

 

 

Setup: The system is operated through a sequence of events to test the compo-

 

Refrigerant Probes,

nents. The sequence is: Step 1, de-energize all outputs; Step 2, start unit with

P6

Compressor

unloader valve open. Open then close the suction modulation valve. Monitor

suction pressure; Step 3, open suction modulation valve to a known position;

and

 

Step 4, close suction modulation valve to a know position; Step 5, open econo-

 

Refrigeration valves

 

 

mizer valve; Step 6, close unloader valve; Step 7, open unloader valve; Step 8,

 

 

close economizer valve; Step 9, de-energize all outputs.

P6-0

Discharge

If alarm 64 is activated any time during the first 45 second period of Step 1, the

Thermistor Test

test fails.

 

P6-1

Suction

If alarm 69 is activated any time during the first 45 second period of Step 1, the

Thermistor Test

test fails.

 

P6-2

Discharge Pressure

If alarm 65 is activated any time during the first 45 second period of Step 1, the

Sensor Test

test fails.

 

P6-3

Suction Pressure

If alarm 66 is activated any time during the first 45 second period of Step 1, the

Sensor Test

test fails.

 

P6-4

Compressor Current

Compressor current is tested before and after start up. If current does not in-

Draw Test

crease, the test fails.

 

P6-5

Suction Modulation

Suction pressure is measured before and after the valve opens. If suction pres-

Valve Test

sure does not increase, the test fails.

 

P6-6

Economizer

Suction pressure is measured during Steps 4 and 5. If suction pressure does not

Valve Test

increase, the test fails.

 

P6-7

Unloader Valve Test

Suction pressure is measured during Steps 6 and 7. If suction pressure does not

 

 

increase, the test fails.

T-309

3-22