Power
Thermostat Wiring
Supply Air
| Building |
|
Flexible | Loop |
|
|
| |
Connection |
| |
| Water |
|
| Out |
|
| Water |
|
| In | Balancing Valve |
|
| (field installed |
and calibrated | ||
stainless steel | accessory) | |
braid | hose |
|
with integral | Low Pressure | |
“ J” swivel | Drop Water | |
|
| Control Valve |
|
| (optional) |
|
| |
|
| accessory) |
| Ball Valve with optional | |
Compressor | integral P/T plug | |
Access Panel | (typical for supply and | |
| return piping) |
conversion process is the same for right and left return configu- rations. See Fig. 11 and 12.
NOTE: It is not possible to convert return air between left or right return models in the field due to refrigerant piping changes.
Preparation — The unit should be on the ground in a well lit area for conversion. Hung units should be taken down to ground level before converting.
Side to Back Discharge Conversion
1. | Remove screws to free the top and discharge panels. See |
| Fig. 11. |
2. | Remove the access panel and set aside. |
3. | Lift the discharge panel from side of unit and rotate it to |
| back using care not to damage blower wiring. |
4. | Check blower wire routing and connections for undo |
| tension or contact with sheet metal edges. |
| necessary. |
NOTE: Ball valve with integral pressure temperature plug recommended.
Fig. 9 — Typical Vertical Installation —
50RVC,RVR,RVS Units
5. | Check refrigerant tubing for contact with other compo- |
| nents. Adjust if necessary. |
6. | Reinstall top panel using screws set aside in Step 1. |
Power
Thermostat Wiring
Compressor Access Panel
Flexible | Building |
|
Connection | Loop |
|
| Water | Water |
| Out | |
| In | |
|
| |
|
| Balancing Valve |
|
| |
|
| and calibrated |
| accessory) | |
|
| |
| stainless steel | Low Pressure |
| braid hose | |
| with integral | Drop Water |
| “ J” swivel | Control Valve (optional) |
|
| |
|
| accessory) |
Ball Valve with optional integral P/T plug (typical for supply and return piping)
Flexible
Connection
Supply Air
NOTE: Location for some screws at bottom of discharge panel may have to be changed.
7.Manually spin fan wheel to check for obstructions. Adjust for any obstruction found.
8.Replace access panel.
Back to Side Discharge Conversion — Follow instructions above for Side to Back Discharge Conversion, noting the panels would be reversed.
Water | Remove Screws |
Connection End |
|
Return Air
NOTE: Ball valve with integral pressure temperature plug recommended.
Fig. 10 — Typical Downflow Installation —
50RDS Units
Step 3 — Unit Location — The following guidelines should be considered when choosing a location for a WSHP:
•Units are for indoor use only.
•Locate in areas where ambient temperatures are between 40 F and 100 F and relative humidity is no greater than 75%.
•Provide sufficient space for water, electrical and duct connections.
•Locate unit in an area that allows easy access and removal of filter and access panels.
•Allow enough space for service personnel to perform maintenance.
•Return air must be able to freely enter the space if unit needs to be installed in a confined area such as a closet.
NOTE: Correct placement of the horizontal unit can play an important part in minimizing sound problems. Since duct- work is normally applied to these units, the unit can be placed so that the principal sound emission is outside the oc- cupied space in
FIELD CONVERSION OF DISCHARGE AIR — The dis- charge air of the 50RHC,RHR,RHS horizontal units can be converted between side and back discharge in the field. The
Side Discharge
Water
Connection End
Rotate
Return Air
| Move to Side |
Water | Replace Screws |
Connection End |
|
Return Air
Drain
Back Discharge | Discharge Air |
Fig. 11 — Conversion Left Return, Side Discharge to Back Discharge
14