Turbomachinery Package Specification | Titan 250 Generator Set |
|
|
Applicable Engineering Specifications
Solar’s Engineering Specification ES | Fuel, Air, and Water (or Steam) for Solar Gas |
| Turbine Engines |
Solar’s Engineering Specification ES 1593 | Guidelines for NEC Compliance of Solar Product |
| Lines: Class I, Group D, Division 1 and Division 2 |
Solar’s Engineering Specification ES 1762 | Standards and Practices for Electrical Systems for |
| Gas Turbine Packages Installed In Hazardous |
| Areas (CENELEC/IEC Standards – European |
| ATEX Directive 94/9/EC) |
Applicable Product Information Letters |
|
Solar’s Product Information Letter PIL 058 | Package Sound Levels |
Solar’s Product Information Letter PIL 161 | Lube Oil System Cleanliness |
(a)A pressure control valve regulates main lube oil supply pressure to 241 kPag (35 psig) when unit is at normal operating temperature.
(b)Prevailing winds must be considered to prevent the lube oil cooler from exhausting into the engine air inlet system or to take air in from the engine exhaust system. No airflow backpressure is allowed at the lube oil cooler face.
(c)The maximum total design pressure drop of the off skid oil cooler loop including supply and return lines shall not exceed 50 psid (345 kpad) at the design flow rate and an oil viscosity of 60 ssu (10.5 centistokes). No check valves are allowed in the oil cooler loop. This is recommended for all applications (but mandatory for units in cold climates), oil cooler supply, return and optional vent lines must slope from the oil cooler to the turbine package to facilitate draining when the unit is not operating.
(d)The heater is mandatory if unit ambient temperature is less than 10°C (50°F).
(e)The lube oil tank immersion heater ensures the lube oil tank temperature remains above 10°C (50°F) for starting in cold temperatures.
(f)The flame arrestor must be installed vertically at the end of the lube tank vent piping.
(g)
(h)An additional 246 L (65 gal) is required for package filters and piping. Additional oil will also be required to fill any offskid oil piping and vessels (if applicable).
© 2008 Solar Turbines Incorporated. All rights reserved. | TPS250GS/908 - Preliminary |