Turbomachinery Package Specification

Titan 250 Generator Set

 

 

16.2.6Source Inspection

As an option, Solar can conduct a final product inspection at the supplier facility for the following contract-specific items:

Inlet system filter

Inlet system silencer

Exhaust system silencer

Lube oil cooler

Generator, including rotor balancing and standard generator testing

16.2.7Customer Participation

As an option, the customer may witness specified tests on a noninterference basis and/or hold point basis.

16.2.8Weld Radiography

As an option, radiographic welding inspections can be performed on a percentage of the gas fuel and/or lube oil system piping and manifolds.