Chapter 2 Preparing for Installation

Site Preparation Checklist

Table 2-5 AC-Input Power Cord Options

Locale

Description

Product Number

 

 

 

2500W Power Supply (WS-CAC-2500W=)

 

 

 

 

North America

12 AWG, 16A/250V

CAB-AC-2500W-US1=

(nonlocking)

 

 

 

 

 

North America

12 AWG, 16A/250V

CAB-AC-C6K-TWLK=

(locking)

 

 

 

 

 

Europe

2.5 mm, 16A/250V

CAB-AC-2500W-EU=

 

 

 

International

2.5 mm, 16A/250V

CAB-AC-2500W-INT=

 

 

 

DC-Powered Systems

Basic guidelines include the following:

Each chassis power supply should have its own dedicated input power source.

The circuit must be protected by a dedicated two-pole circuit breaker. The circuit breaker should be sized according to the power supply input rating and local or national code requirements.

The circuit breaker is considered the disconnect device and should be easily accessible.

The power supply ground should connect to protective earth ground even though the system ground connection is provided.

The DC return is to remain isolated from the system frame and chassis (DC-I).

Site Preparation Checklist

Table 2-6lists the site planning activities that you should perform prior to installing the Cisco 7609 Internet Router. Completing each activity helps ensure a successful switch installation.

 

 

Cisco 7609 Internet Router Installation Guide

 

 

 

 

 

 

OL-5079-04

 

 

2-11

 

 

 

Page 43
Image 43
Cisco Systems 7609 manual Site Preparation Checklist, DC-Powered Systems