Chapter 2 Preparing for Installation
Site Preparation Checklist
Table
Task No. |
| Planning Activity | Verified By | Time | Date |
|
|
|
|
|
|
|
|
1 |
| Space evaluation: |
|
|
|
|
|
| Space and layout |
|
|
|
|
|
| Floor covering |
|
|
|
|
|
| Impact and vibration |
|
|
|
|
|
| Lighting |
|
|
|
|
|
| Maintenance access |
|
|
|
|
|
|
|
|
|
|
|
2 |
| Environmental evaluation: |
|
|
|
|
|
| Ambient temperature |
|
|
|
|
|
| Humidity |
|
|
|
|
|
| Altitude |
|
|
|
|
|
| Atmospheric contamination |
|
|
|
|
|
| Airflow |
|
|
|
|
|
|
|
|
|
|
|
3 |
| Power evaluation: |
|
|
|
|
|
| Input power type |
|
|
|
|
|
| Power receptacles |
|
|
|
|
|
| Receptacle proximity to the equipment |
|
|
|
|
|
| Dedicated (separate) circuits for redundant |
|
|
|
|
|
| Power supplies |
|
|
|
|
|
| UPS for power failures |
|
|
|
|
|
| DC systems: Proper gauge wire and lugs |
|
|
|
|
|
|
|
|
|
|
|
4 |
| Grounding evaluation: |
|
|
|
|
|
| Circuit breaker size |
|
|
|
|
|
| CO ground (AC- and |
|
|
|
|
|
|
|
|
|
|
|
5 |
| Cable and interface equipment evaluation: |
|
|
|
|
|
| Cable type |
|
|
|
|
|
| Connector type |
|
|
|
|
|
| Cable distance limitations |
|
|
|
|
|
| Interface equipment (transceivers) |
|
|
|
|
|
|
|
|
|
|
|
6 |
| EMI evaluation: |
|
|
|
|
|
| Distance limitations for signaling |
|
|
|
|
|
| Site wiring |
|
|
|
|
|
| RFI levels |
|
|
|
|
|
|
|
|
|
|
|
|
| Cisco 7609 Internet Router Installation Guide |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|