Chapter 3 Installing the Cisco 7609 Internet Router

System Ground Connection

System Ground Connection

This section describes how to connect a system (earth) ground to the Cisco 7609 Internet Router.

Note You must connect both the system ground connection and the power supply ground connection to an earth ground. The system ground connection is required if Foreign Exchange Station (FXS) modules are installed or if this equipment is installed in a US or European Central Office.

Two threaded M4 holes are provided on the chassis frame to attach the ground cable. (See Figure 3-6.)

Note If FXS modules are installed or if this equipment is installed in a US or European Central Office, you must use the system (earth) ground on both AC- and DC-powered systems.

Required Tools and Equipment

To connect the system ground, you need the following tools and materials:

Note Materials are not provided; contact any commercial cable vendor for the required parts.

Grounding lug

The grounding lug must have two M4 screw holes and accept 6 AWG wire.

Two M4 (metric) hex-head screws with locking washers

One grounding wire

The grounding wire should be sized according to local and national installation requirements. The length of the grounding wires depends on the proximity of the Cisco 7609 Internet Router to proper grounding facilities.

Number 2 Phillips-head screwdriver

Crimping tool

 

Cisco 7609 Internet Router Installation Guide

3-12

OL-5079-04

Page 56
Image 56
Cisco Systems 7609 manual System Ground Connection, Required Tools and Equipment