Chapter 2 Switch Installation
Installing the Switch
After the switch is mounted in the rack:
•Wire the switch to a power source. See Chapter 3, “Power Supply Installation.”
•Connect the ports. See the “Connecting Devices to the Ethernet Ports” section on page
•We recommend attaching the cable guide to prevent the cables from obscuring the LED panels on the devices in the rack. Use the supplied black screw shown in Figure
For configuration instructions about the CLI setup program, go to Appendix C, “Configuring the Switch with the CLI Setup Program.”
Wall-Mounting
To
•Attaching Brackets, page
•Attaching Brackets for
•
Warning Read the
Warning For mounting
Note If the switch is
-Sides of switch (facing up and facing down): 3.75 in. (9.52 cm)
-Port side 3.0 in. (7.62 cm)
-Power supply side: 5.25 in. (13.33 cm)
-Cover side (side not facing wall): 1.75 in. (4.44 cm)
-Base side (facing wall): 0 in. (0 cm)
Cisco IE 3010 Switch Hardware Installation Guide
|
| ||
|
|