![](/images/new-backgrounds/1158888/15888887x1.webp)
Installing a Port Adapter
Step 6 Place the port adapter on an antistatic surface with its components facing upward, or in a static shielding bag. If the port adapter will be returned to the factory, immediately place it in a static shielding bag.
This completes the procedure for removing a port adapter from a Cisco uBR7200 series router.
Installing a Port Adapter
Take the following steps to install a
Step 1 Attach an
Step 2 Use both hands to grasp the port adapter by its metal carrier edges and position the port adapter so that its components are downward. (See Figure
Step 3 Align the left and right edge of the port adapter metal carrier between the guides in the port adapter slot. (See Figure
Figure 5-5 Aligning the Port Adapter Metal Carrier Between the Slot Guides
Inside slot guide
PC board
Metal carrier
H11519 |
Step 4 With the metal carrier aligned in the slot guides, gently slide the port adapter halfway into the slot.
Caution Do not slide the port adapter all the way into the slot until you have connected all required cables. Trying to do so will disrupt normal operation of the router.
Step 5 With the port adapter halfway in the slot, connect all required cables to the port adapter.
Step 6 After connecting the cables, carefully slide the port adapter all the way into the slot until the port adapter is seated in the router midplane.
Step 7 Place the port adapter in the locked position.
•For the Cisco uBR7246, slide the port adapter retention clip up to the locked position. (See Figure