Conair CHS-810 manual Closing the Screen Box, Granule Bin and Hopper, Close the hopper

Models: CHS-810

1 88
Download 88 pages 42.76 Kb
Page 27
Image 27
Closing the Screen Box, Granule Bin and Hopper

Closing the Screen Box, Granule Bin and Hopper

NOTE: Before closing, make sure that the mating surfaces are clean!

There is a pinch risk during closing, be careful.

Close the screen box and install the granule bin

1Make sure that the screen is correctly positioned in the screen box.

2Lift the screen box up and tighten the star knobs properly to stop.

3Install the granule bin.

4Install the extraction pipe.

 

Alt. CF machine with extraction fan, do up the quick

D

5

coupling (D) on the outlet pipe stub.

 

Close the door.

 

Close the hopper

1

Check and make sure that

 

 

no granulate lies on the

 

2

mating surfaces or flanges.

 

Shut/fold back the hopper.

 

3

Open and make sure that the

 

4

tipping catch falls into the cutout.

 

Lock the hopper with the star knobs, tighten

 

5

the star knobs properly to stop.

 

 

Switch the main switch “On”.

5 Installation

6

Start the granulator.

 

 

 

 

I n s t a l l a t i o n l 5 - 5

Page 27
Image 27
Conair CHS-810 manual Closing the Screen Box, Granule Bin and Hopper, Close the screen box and install the granule bin