CHS Tangential Feed Granulators
Models CHS-810, CHS-814, CHS-819, and CHS-824
Date Manual Number UGG011/0504 Serial Numbers Model Numbers
Table of Contents
Technical Specification
4. Safety Instructions
Installation
Service
Spare Parts List
Wiring Diagram
i i l Ta b l e o f C o n t e n t s
11. Accessories, Overview
A. Customer Service
10. Layout
12. Transport and Storage
i v l Ta b l e o f C o n t e n t s
I n t r o d u c t i o n
P u r p o s e o f t h e U s e r G u i d e . . . . . . . . . . . . . 1
H o w t h e G u i d e i s O r g a n i z e d . . . . . . . . . . . . 1
AT T E N T I O N
Your Responsibility as a User
Purpose of the User Guide
How the Guide is Organized
1 I n t r o d u c t i o n
AT T E N T I O N Read This so no One Gets Hurt
WARNING Voltage hazard
This manual applies to the CHS series of Conair granulators
Technical Specifications l 2
Technical Specifications
Technical Specifications
Hardened cutter housing
2 - 2 l Technical Specifications
Performance characteristics
SPECIFICATION NOTES
Function Description
G e n e r a l
S a f e t y S y s t e m
Function Description
Function Description
General
models with a conveyor, the hopper is equipped with a conveyor belt. The conveyor can be equipped with a metal detector
Emergency Stop
Safety System
Safety Switch
Star Knob
Before Starting
3 - 6 l Function Description
S a f e t y I n s t r u c t i o n s l 4
Safety Instructions
4 S a f e t y I n s t r u c t i o n s
Safety Instructions
Electrical installation must only be done by a competent electrician
During maintenance, pull out the plug on the distribution box
If the rotor must be turned manually - do this with great care
DANGER! Be careful
DANGER! High voltage
DANGER! Cutting or pinch risk
4 - 4 l S a f e t y I n s t r u c t i o n s
I n s t a l l a t i o n
I n s t a l l a t i o n l 5
Two Hours After First Start
I n s t a l l a t i o n
Pre-Start Checks
Electrical Connection
The granulator should be connected by a competent electrician
Check the direction of rotation of the granulator motor
If any direction of rotation should be incorrect
Opening of Hopper, Screen Box and Granule Bin
Opening the hopper
Opening the screen box
screen box, switch both the main switch and
Close the screen box and install the granule bin
Closing the Screen Box, Granule Bin and Hopper
Close the hopper
There is a pinch risk during closing, be careful
5 - 6 l M a i n t e n a n c e
Operation and Daily Maintenance
Maintenance
Operation and Daily Maintenance l 6
S t a r t i n g a n d S t o p i n g
6 - 2 l Operation and Daily Maintenance
Operation and Daily Maintenance
Starting and Stopping
Inspection
Daily Inspection
Weekly Inspection
Monthly Inspection
6 - 4 l Operation and Daily Maintenance
Cleaning
Switch “Off” both the main switch and the switch on the granulator
Re-install after cleaning
The granulator does not start
Fault-Finding
6 - 6 l Operation and Daily Maintenance
Operation and Daily Maintenance l 6
6 - 8 l Operation and daily maintenance
S e r v i c e
Service
Changing the knives
Removing the knives
Changing the knives
Install the rotating knives
Installing the Knives
First install the rear, fixed knife
6 Install screws A with washers B, and tighten so that they hold
Then install the front, fixed knife
Sharpening Knives
Sharpening Knives - Granulators with Open Cutter
Grind the cutting angle of the knives to
The granulator is driven by 3 V-belts Checking the V-belts
V-Belts, Inspection, and Adjustment
Transmission
Transmission continued
V-belt Adjustment
7 - 1 0 l Service
Lubrication
Cutter Housing
Installing
Cutter Pulley/Motor Pulley
Removal
Cutter Pulley
7 - 1 2 l Service
Spare Parts List
S a f e t y
Spare Parts List
Ordering Spare Parts
Description
Cutting Chamber
Art. no
Staggered Rotor
Art. no
Description
8 - 4 l S p a r e P a r t s L i s t
Open Rotor
List
Spare
Parts
8 - 6 l S p a r e P a r t s L i s t
Knives, Open Cutter
Knives
Transmission
8 - 8 l S p a r e P a r t s L i s t
Screen
Screen Box
Granule Bin Manual Optional
Vaccum Suction /Blower F-7/F-15
8 - 1 0 l S p a r e P a r t s L i s t
Pos Qty
Art. no
Hopper
Hopper - Noise encapsulated machine with with Conveyor
8 - 12 l S p a r e P a r t s L i s t
Hopper Device
S p a r e P a r t s L i s t l 8 - 1
Sound Cabin
8 - 14 l S p a r e P a r t s L i s t
8.17 Enclosure/Body
Safety
8 - 1 6 l S p a r e P a r t s L i s t
Wiring Diagram
9 Wiring Diagram
W i r i n g D i a g r a m
W i r i n g D i a g r a m l 9
Wiring diagram
Current Sensing Relay
Relay functions and normal settings
Connection
Default setting for this granulator
Example
Relay Setting
9 - 6 l W i r i n g D i a g r a m
L a y o u t
1 0 Layout
Layout
1 0 - 2 l L a y o u t
1490mm58.66in
1650mm64.96in
27.56in.700mm
1790mm70.47in
1 0 - 4 l L a y o u t
A c c e s s o r i e s
1 1 Accessories
A c c e s s o r i e s
Ordering Spare Parts
Installation of Pre-Set Knives
Pre - Setting of Rotating Knives, Granulator with Open Cutter
Setting Up the Knives
Tighten the fastening screws, tightening torque 162.26lb-ft 220 Nm
Sharpening
Installation
Third Fixed Knife
Safety
Band Conveyor
Electrical Connection
The band conveyor should be connected up by an authorised electrician
Maintenance
Trouble-shooting
Starting
If the belt moves obliquely
Spare Parts for the Band Conveyor
11 - 8 l A c c e s s o r i e s
Transport and Storage
U n p a c k i n g a n d C h e c k i n g
Transport and
Storeage
Transport and storage
Lifting and Transport to Place of Use
Unpacking and Checking
Positioning in Place of Use
Storage
Long-Term Storage/Conservation
1 2 - 4 l T r a n s p o r t a n d S t o r a g e
How to Contact Customer Ser vice
We’re Here to Help
Before You Call
From outside the United States, call
Equipment Guarantee
Performance Warranty
Warranty Limitations
A - 2 l A p p e n d i