Cornelius 2 Flavor Installation, Counter Location, Filling The Ice Bath, Connecting Water Supply

Models: 2 Flavor 4 Flavor

1 43
Download 43 pages 3.75 Kb
Page 9
Image 9
INSTALLATION

Quest Juice Training Manual

INSTALLATION

COUNTER LOCATION

The minimum airflow clearance is: 4” (10.16 cm) in back and 12” (30.48 cm) on top and open to the front.

IMPORTANT: Condenser air is drawn in from the bottom of the rear panel and discharged out the top of the rear panel. Failure to maintain clearance space will reduce capacity of the unit and cause premature compressor failure.

FILLING THE ICE BATH

The fill tube is located behind the splash panel. Use the water supply line to fill the ice bath before con- necting it to the unit.

Remove the 3/8” cap from the fill tube/sight glass to begin filling the ice bath. Replace the cap when fin- ished filling the ice bath. Lock it in place with its holder.

COUNTER LOCATIONFILLING THE ICE BATH Full Water

Level

IMPORTANT: Fill the water bath slowly until it runs out the overflow. Failure to do so can cause back pres- sure and improper water level. ALWAYS FILL WITH THE UNIT UNPLUGGED.

Cabinet CONNECTING WATER SUPPLYPRIMING/FLUSHING WATER SYSTEM drain outlet

Water bathManual backgroundManual background overflow

Replace the cap TIGHTLY when finished filling the water bath. Lock it in place with its holder.

CONNECTING WATER SUPPLY

The QST series Juice Dispenser is designed to dispense juice at a high flow rate. It is very important that the incoming water line be dedicated for use by the dispenser only and does not have other machines connected which could cause a water surge, (i.e., a dishwasher, coffee maker, etc.).

IMPORTANT: The water supply should be consistent with proper water quality standards (neutral pH of

7.0to 8.0), and should not be connected to a water softener. It is the installers responsibility to ensure that all water connections to the dispenser are sized, installed, and maintained according to Federal, State, and Local Laws.

Secure the 3/8” (0.95 cm) swivel nut on the flexible supply tubing to the water inlet located at the rear of the dispenser. Make sure that the flared gasket is used (tubing and flared gasket are included with the installation kit).

IMPORTANT: When securing flare nut, use a backup wrench on the male side of the inlet fitting (unit side) to prevent twisting of the copper tube inside the unit and/or possible damage to the water strainer/ solenoid. A water shut off outside the unit is recommended.

PRIMING/FLUSHING WATER SYSTEM

To properly prime the unit with water and remove air pockets in the system, open the cabinet door and make sure that all the valve levers are in the “Dispense” position.

Close the door and press the dispense button for a few seconds. Repeat until a steady flow of water is observed flowing from all dis- pense valves.

NOTE: Water splashing may occur during this purge cycle.

Dispense/ Flush Lever

© 2004, IMI Cornelius Inc.

- 5 -

Publication Number: TP00968

Page 9
Image 9
Cornelius 2 Flavor, 4 Flavor manual Installation, Counter Location, Filling The Ice Bath, Connecting Water Supply