User Manual - 15 kVA - 300kVA, 3 Phase, 50 & 60 Hz
Liebert FPC
AC Power
For Business-Critical Continuity
Page
1.0 INSTALLATION INSTRUCTIONS
TABLE OF CONTENTS
3.0 INSPECTION AND STARTUP CHECKLIST
5.0 MAINTENANCE
TABLES
FIGURES
Read the entire manual before installing or operating the system
IMPORTANT SAFETY INSTRUCTIONS
1.0 INSTALLATION INSTRUCTIONS
1.1 Unpacking and Installation
1.1.1 Unpacking and Preliminary Inspection
1.1.2 Handling Considerations
Footprint and Floor Cutout Dimensions
Front
Cabinet Dimensional Data
23-inch cabinet weight
Footprint and Floor cable access and
Front
Cutout Dimensions cooling airflow
47-inch cabinet weight
1.1.4 Location Considerations
1.1.3 Unit Preparation
Liebert FPC heat output
Figure 3 Recommended minimum service and ventilation clearances
Figure 4 Floor pedestal details
1.1.5 Floor Pedestal Installation
1.3 Power and Control Wiring
1.2 Additional Distribution Mounting & Wiring
1.3.1 Input Power Connections
1.2.1 Liebert FDC Distribution Mounting
15006 - Rev
Figure 5 Electrical connection location for 23 584mm cabinet
FPC15000 Rev
Detail B Output Ground Busbar Approx. 1/4 Thick
Square “D” I-Line Panelboard
88 22mm
88 22mm
Installation Instructions
Table 4 Suggested minimum input wire size data
Units with Transformers
Transformerless Units
Suggested minimum input wire size data continued
Installation Instructions
Table 5 Main input circuit breaker interrupting rating
Table 6 Main input junction box electrical connections 4 wire
1.3.2 Junction Box Installation
Table 8 Low-voltage control junction box dimensions, typical
Main input power junction box dimensions, typical
Equipment Grounding
1.3.3 System Grounding
Figure 10 Low voltage control junction box connections, typical
Figure 11 Main input junction box connections, typical
Signal Reference Grid
1.3.4 Grounding Electrode Conductor for FPCs With Transformer
Table 10 Minimum grounding electrode conductor size AWG
Typical Liebert FPC with transformer grounding arrangement
systemTypical Liebert FPC without transformer grounding
Figure 12 Typical grounding arrangements
1.3.5 Output Power Connections
Liebert FPC
Installation Instructions
Figure 13 Typical Liebert FPC equipment arrangement
+24VDC
Liebert FPC
Unit EPO
24VDC
Terminal Strip
Low Voltage
Figure 15 Typical control wiring for units without monitoring
Wiring
Low Voltage Terminal Strip
Figure 16 Typical control wiring for units with monitoring
Factory-Supplied Wiring
Warranty
Checklists
2.1 Internal Inspection
2.2 Startup
Table 12 Panelboard main circuit breaker torque specifications
Table 11 Torque specifications, general
Table 13 Branch circuit breaker torque specifications
Table 14 Terminal block compression lug torque specifications
3.1 Inspection
3.0 INSPECTION AND STARTUP CHECKLIST
3.2 Startup
Power Monitor Panel
Basic Indicators
3.3 Monitoring System Check-Out
Manual Restart Check
3.4 Equipment Connection Check-Out of Units With Distribution Cables
Customer Alarms
4.1.1 Emergency Shutdown-If Emergency Power Off switch is supplied
4.1 Startup Procedures
4.0 OPERATING INSTRUCTIONS
4.1.2 Normal System Shutdown
Alarm Present/Silence
4.3 Power Monitor Panel
4.2 Basic Monitor Panel Units Without Monitoring
Figure 18 Power monitor panel
Alarms - Upon occurrence of any of the following alarms, the alarm message appears on the LCD dis- play, the Alarm Present/Silence switch is illuminated, and the audible alarm is activated. Pressing the “Alarm Present/Silence” switch silences the audible alarm. After the alarm condition is corrected, the alarm can be reset by pressing the “Alarm Present/Silence” switch when prompted by the LCD display or by way of any Central Monitoring System
Table 16 RS-232 ASCII port customer commands
Table 15 ASCII interface default parameters
Operating Instructions
Table 17 Monitored parameters data definitions
Field #
Data item
5.0 MAINTENANCE
5.2 Inspection and Cleaning
5.1 Repair
5.2.1 Inspection Schedule
Page
0f Mission-Critical Data And Applications
Ensuring The High Availability
Ne t
ti n