Emerson user manual Typical Liebert FPC equipment arrangement, Installation Instructions

Models: FPC

1 40
Download 40 pages 27.65 Kb
Page 23
Image 23

Installation Instructions

Figure 13 Typical Liebert FPC equipment arrangement

Liebert FPC

Ground electrode conductor (not by Liebert) required per NEC for units with transformer

Remote Emergency Power Off Switch (REPO)

Main input power to unit (not by Liebert)

ƒ3-phase, 3-wire plus ground for units with transformer

ƒ3-phase, 4-wire plus ground for units without transformer

*Transient suppression plate

 

Low voltage junction

Building interface and

 

 

alarm connections

 

box and cable

(not by Liebert)

* Flexible distribution cables

 

per customer specifications

 

* Optional devices : Refer to the

Main input junction box and cable specification sheet for options supplied

19

Page 23
Image 23
Emerson user manual Typical Liebert FPC equipment arrangement, Installation Instructions