Inspection and Startup Checklist

Customer Alarms

If customer alarms are provided:

___ 1. With the FPC ON, simulate alarm operation by jumpering the appropriate low-voltage control terminals. (Refer to the control wiring installation drawing furnished with the unit.)

___ 2. Verify correct alarm annunciation by the Power Monitor Panel and/or by the Centralized Monitoring System.

3.4Equipment Connection Check-Out of Units With Distribution Cables

!

___ 1.

___ 2.

CAUTION

All loads should be disconnected or turned off before proceeding with the following steps.

For units with output distribution cables, be sure that NO output receptacles are connected to load equipment plugs and that the receptacles are not in contact with foreign objects.

Pay special attention to those output cables intended for direct wiring connection; the exposed conductor ends of these cables must not be in contact with each other or with any foreign objects.

Turn on main input power to the unit, then turn on the panelboard main output breaker(s).

Individually turn on each branch circuit breaker and check the output voltage (also phase rotation, if a 3-phase circuit) at the receptacle or cable end.

___ 3. Turn OFF all branch circuit breakers and the panelboard main output circuit breaker(s).

___ 4. Connect the load equipment per equipment manufacturer’s specifications and recommendations.

___ 5. Turn on the panelboard main output breaker(s).

___ 6. Turn on branch circuit breakers to the load equipment.

!

___ 7.

___ 8.

CAUTION

Observe the power-up sequence recommended by the equipment manufacturer.

Verify that all load equipment operates properly.

Replace all unit panels. After performing the inspection and start-up procedure described in

3.0- Inspection and Startup Checklist in this manual, complete the Start-Up and Inspection form furnished with the unit, sign the completed form and return it to:

Liebert Corporation

1050 Dearborn Drive P.O. Box 29186 Columbus, Ohio 43229 USA

NOTE

Warranty is not in effect until the inspection and startup form is received by the factory.

28

Page 32
Image 32
Emerson FPC user manual Customer Alarms