Chapter 2

Hardware Preparation and Installation

2.1Overview

This chapter describes all necessary steps you need to take in order to install the RTM-ATCA-

F120-OPT. The main steps are:

zInspect the shipment and unpack the RTM

zMake sure environmental and power requirements are met

zInstall the RTM

2.2Unpacking and Inspecting the RTM

Damage of Circuits

Electrostatic discharge and incorrect installation and removal of the blade can damage circuits or shorten their life.

Before touching the blade or electronic components, make sure that your are working in an ESD-safe environment.

To inspect the shipment, perform the following steps.

Shipment Inspection

1.Verify that you have received all items of your shipment: Printed user manual (Getting Started guide) RTM-ATCA-F120-OPT

RTM-ATCA-F120-OPT Installation and Use (6806800G29C)