Configuring the PathBuilder S200 Series Switch for Bridging Operation

5)The PathBuilder S200 series switch transfers a copy of the ARE frame from the LAN Port across LAN Bridge Link number 1 to the Bridge (Figure 24). Since the frame is an All Routes Explorer, the Bridge broadcasts the frame across each of the existing WAN Bridge Links (32 max) to the WAN Adapter module.

6)The WAN Adapter transmits each ARE frame to a separate, already established SVC which connects it across the WAN to a remote node (Figure 25). Note that in the node attached to LAN AAA, three bridge links (5, 6, and 7) to the WAN side are necessary because they go to the three remote LANs to establish complete bridges to those LANs. The three right-hand nodes really need only one WAN Bridge Link each, but two additional ones are shown; they could be attached to other bridges in other nodes not shown.

 

LAN Bridge Link

 

 

PC

Bridge

5

WAN

 

 

 

 

Adaptor

 

 

 

 

 

 

Port

 

ARE Frame

 

 

 

 

 

LAN

55

 

 

 

1

6

 

WAN

AAA

 

 

 

 

 

 

 

ARE Frame

Port

 

 

 

 

 

 

7

 

 

 

 

 

ARE Frame

 

WAN Bridge Links

SVCs

 

(PVCs for Frame Relay)

Figure 24. PathBuilder S200 Series Switch Transfers a Copy of ARE

Frame to the Bridge Module

44

Bridging

Page 48
Image 48
EXP Computer S200 manual LAN Bridge Link