4.— Final Installation

 

a. Slide the covers of the PMK 550 onto the base

 

plate, ensuring the power cable can exit the unit

 

through the power cable access slot.

 

b. Using a 5/32 inch hex wrench, tighten down

 

the four screws on the PMK 550 to secure the

 

sides in place.

 

c. Check and tighten the adjuster plate locking

 

screws on the projector bracket.

 

d. Hole plugs can be used to cover any exposed

 

holes in the slotted pipe if necessary.

Ü Slide the covers onto the PMK 550.

 

PoleVault IP Systems• Installation — Stage 5 (Configuration)

41

Page 45
Image 45
Extron electronic 305SA manual Final Installation